09.08.2015 Views

DRAFT

FY 2020 - PSTA

FY 2020 - PSTA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 7-6Vision Plan – Combined Operating and Capital Costs and Revenues (FY 2010/11 – FY 2019/20)$300,000,000$250,000,000$200,000,000$150,000,000$100,000,000TotalCostsTotalRevenues$50,000,000$-2011 2012 2013 2014 2015 2016 2017 2018 2019 2020Service ImprovementsThe vision plan consists of more than just bus service but fixed-guideway transit service, as well. Transitimprovements in the 2035 Vision Plan are comprised of four major networks of services. Those networksinclude the following:PSTA Alternatives Analysis (AA) CorridorsCross-Bay Express Bus ConnectorsPremium Bus NetworkLocal Service NetworkTogether, the four networks are designed to address regional and local public transportation needs. Adescription of each service network is provided below. In addition, Maps 7-1 through 7-3 illustrate the firstthree Vision Plan service networks and Map 7-4 illustrates all four service networks.Tindale-Oliver & Associates, Inc.Pinellas Suncoast Transit AuthoritySeptember 2010 7-10 Transit Development Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!