08.12.2012 Views

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Investigate and maintain current<br />

blockages <strong>for</strong> pike in Schoodic lower until<br />

phase 1 <strong>of</strong> alewife res<strong>to</strong>ration is complete<br />

and group 1 American shad res<strong>to</strong>ration is<br />

23.1.1.3 complete.<br />

Create velocity or jump barriers <strong>for</strong> pike<br />

while allowing Atlantic salmon <strong>to</strong> pass in<br />

D-F upper and lower and Guil<strong>for</strong>d lower<br />

until phase 1 <strong>of</strong> alewife res<strong>to</strong>ration is<br />

complete and group 1 American shad<br />

2009 -2014 DMR/IFW $50,000<br />

23.1.1.4 res<strong>to</strong>ration is complete 2009 -2014 DMR/IFW $50,000<br />

23.1.1.5 Continue removal ef<strong>for</strong>ts at Pushaw Annual IFW $150,000<br />

E-fish around <strong>the</strong> known spawning areas<br />

23.1.1.6 <strong>to</strong> look <strong>for</strong> nursery areas. Annual IFW $25,000<br />

Review current fishing regulations and<br />

23.1.1.7 develop recommendations <strong>for</strong> changes. 2009-2010 DMR/IFW $0<br />

Review current education ef<strong>for</strong>ts and<br />

23.1.1.8 develop recommendations <strong>for</strong> changes.<br />

Maintain public education ef<strong>for</strong>ts<br />

highlighting <strong>the</strong> permanent repercussions<br />

and costs associated with illegal fish<br />

2009-2010 DMR/IFW $10,000<br />

23.1.1.9 s<strong>to</strong>cking events. Annual DMR/IFW $75,000<br />

Conduct a study <strong>of</strong> Pushaw Stream and<br />

23.1.1.10 Mud pond <strong>to</strong> look <strong>for</strong> juvenile pike<br />

Conduct habitat surveys <strong>of</strong> <strong>the</strong><br />

Penobscot mainstem from Mil<strong>for</strong>d <strong>to</strong><br />

Howland <strong>to</strong> determine <strong>the</strong> spatial<br />

distribution, quantity and quality <strong>of</strong><br />

habitat patches necessary <strong>for</strong> upstream<br />

2009-2011 DMR/IFW $30,000<br />

23.1.1.11 pike dispersal.<br />

Design and implement a stratified<br />

random survey <strong>for</strong> non-natives in <strong>the</strong><br />

2009-2011 DMR/IFW $30,000<br />

23.1.1.12 drainage Annual DMR/IFW $25,000<br />

LIDAR survey <strong>for</strong> gradient <strong>to</strong> get better<br />

data on potential movement <strong>of</strong> pike and<br />

23.1.1.13 location <strong>of</strong> additional natural barriers. 2010 DMR/IFW $0<br />

Conduct a risk assessment <strong>for</strong> Nor<strong>the</strong>rn<br />

23.1.3 pike in <strong>the</strong> rest <strong>of</strong> <strong>the</strong> drainage 2010 Pike Workgroup $0<br />

Identify <strong>the</strong> need <strong>for</strong> risk assessments <strong>for</strong><br />

23.1.3 o<strong>the</strong>r non-native species <strong>of</strong> concern 2010 ITC $0<br />

Hold an annual meeting between IFW<br />

and DMR about limiting s<strong>to</strong>cking <strong>of</strong> non-<br />

23.2.1 natives throughout <strong>the</strong> drainage Annual IFW/DMR $0<br />

Classify species-specific threats based<br />

24.1.1 on scientific literature <strong>to</strong> prioritize risk. 2011 Pike Workgroup $0<br />

Conduct assessments where <strong>the</strong><br />

24.1.2 literature fails <strong>to</strong> provide in<strong>for</strong>mation. 2011 ITC $0<br />

Document dispersal following smallmouth<br />

24.1.3 bass introductions by 2013 ITC $0<br />

PRFP Page 97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!