08.12.2012 Views

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22.4 Use additional in<strong>for</strong>mation and<br />

data <strong>to</strong> indicate habitat quality<br />

(temperature, gradients, drainage<br />

area etc.).<br />

22.4 and<br />

22.5<br />

Review or acquire baseline water<br />

chemistry data in all critical<br />

habitats.<br />

22.5 Condcut studies <strong>for</strong> o<strong>the</strong>r species<br />

<strong>to</strong> identify habitat<br />

22.6 Develop method <strong>to</strong> assess key<br />

qualitative habitat features<br />

(embeddedness, substrate type,<br />

large wood, etc.) and<br />

systematically address <strong>the</strong>se<br />

ideas.<br />

22.6 Establish team <strong>to</strong> develop<br />

watershed assessment plan<br />

2010 DMR $0<br />

2011 DMR $0<br />

2009-2014 DMR $250,000<br />

2009-2014 DMR $250,000<br />

2010 DMR and partners $0<br />

22.6 Develop habitat<br />

protection/res<strong>to</strong>ration plan<br />

2011+ DMR and partners $25,000<br />

22.6 Conduct a basin-wide watershed<br />

assessment per Roni et al.( 2002).<br />

2009-2014 DMR $250,000<br />

22.6.1 Examine <strong>the</strong> fac<strong>to</strong>rs limiting<br />

Atlantic salmon juvenile production<br />

at Katahdin Iron Works area on <strong>the</strong><br />

Pleasant River.<br />

2010 DMR $0<br />

22.7 Revisit <strong>the</strong> water management plan<br />

<strong>for</strong> <strong>the</strong> one major water<br />

control structure in <strong>the</strong> drainage<br />

$0<br />

Grand Lake Matagamon 2010 DMR/DEP<br />

22.8 Undertake an IFIM <strong>to</strong><br />

pinpoint seasonally habitat<br />

protective flows<br />

2010 DMR $0<br />

22.9 Remove or repair roads that impair Annaul<br />

watershed processes<br />

DMR/DOT/MFS $1,000,000<br />

22.10 Support studies <strong>of</strong> MDN inputs <strong>to</strong><br />

<strong>the</strong> basin (see Issue 7)<br />

Annual DMR/NOAA $0<br />

22.11 Identify areas <strong>for</strong> riparian <strong>for</strong>est<br />

improvement and pursue<br />

improvements.<br />

22.11 and<br />

22.12<br />

Complete res<strong>to</strong>ration/protection<br />

projects<br />

22.12 Increase complexity by adding<br />

large wood or boulders<br />

22.12.1 Predict LWD loadings in o<strong>the</strong>r<br />

streams using an LWD loading<br />

model based on <strong>for</strong>est stand data,<br />

environmental variables, and<br />

s<strong>to</strong>chastic events.<br />

22.13 Use PITS model <strong>to</strong> set res<strong>to</strong>ration<br />

goals<br />

Annual DMF/IFW/MFS $25,000<br />

Annual DMR/NGOs $2,500,000<br />

Annual DMR/IFW/MFS $500,000<br />

2010 DMR/USFS/MFS $45,000<br />

2010 NOAA $0<br />

PRFP Page 88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!