08.12.2012 Views

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Management Actions<br />

2009:<br />

a. Maintain current blockages <strong>for</strong> pike in Sebec upper and lower until phase 1 <strong>of</strong><br />

alewife res<strong>to</strong>ration is complete and group 1 American shad res<strong>to</strong>ration is<br />

complete.<br />

a. Develop an MOU <strong>to</strong> re-visit in 2014<br />

b. Investigate and maintain current blockages <strong>for</strong> pike in Schoodic and Seboeis<br />

Lakes until phase 1 <strong>of</strong> alewife res<strong>to</strong>ration is complete and group 1 American<br />

shad res<strong>to</strong>ration is complete.<br />

a. Investigate current structures<br />

b. Develop plan <strong>of</strong> action <strong>for</strong> modification if necessary<br />

c. Develop an evaluation plan<br />

d. Develop a maintenance plan<br />

e. Develop an MOU <strong>to</strong> revisit in 2014<br />

c. Create velocity or jump barriers <strong>for</strong> pike while allowing Atlantic salmon <strong>to</strong> pass<br />

in D-F upper and lower and Guil<strong>for</strong>d lower until phase 1 <strong>of</strong> alewife res<strong>to</strong>ration<br />

is complete and group 1 American shad res<strong>to</strong>ration is complete<br />

a. Investigate current structures<br />

b. Develop plan <strong>of</strong> action <strong>for</strong> modification if necessary<br />

c. Develop an evaluation plan<br />

d. Develop a maintenance plan<br />

e. Develop an MOU <strong>to</strong> revisit in 2014<br />

d. Third party survey <strong>of</strong> potential connections and a development <strong>of</strong> solutions<br />

between <strong>the</strong> West Branch Penobscot River and <strong>the</strong> Pleasant River<br />

(Immediate need) - $15,000<br />

a. Upper Ebeemee and Upper Jo-Mary Lake (<strong>the</strong> West Branch<br />

Penobscot)<br />

b. East Branch Pond, which flows north and south <strong>to</strong> Nollesemic <strong>to</strong> Shad<br />

<strong>to</strong> <strong>the</strong> West Branch Penobscot below two impassable dams.<br />

e. Continue removal ef<strong>for</strong>ts at Pushaw - IFW cost one time $30,000 plus annual<br />

salary.<br />

a. Conduct a study <strong>of</strong> Pushaw Stream <strong>to</strong> look <strong>for</strong> juvenile pike<br />

f. Conduct a study <strong>of</strong> Mud Pond<br />

g. E-fish around <strong>the</strong> known spawning areas <strong>to</strong> look <strong>for</strong> nursery areas.<br />

h. Review current fishing regulations and develop recommendations <strong>for</strong><br />

changes.<br />

i. Review current education ef<strong>for</strong>ts and develop recommendations <strong>for</strong> changes.<br />

j. Maintain public education ef<strong>for</strong>ts highlighting <strong>the</strong> permanent repercussions<br />

and costs associated with illegal fish s<strong>to</strong>cking events.<br />

2010:<br />

b. Continue removal ef<strong>for</strong>ts at Pushaw - annual IFW cost<br />

c. If feasible, install barriers between <strong>the</strong> Pleasant River and <strong>the</strong> West Branch<br />

Penobscot River – Cost TBD<br />

PRFP Page 262

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!