- methods and location <strong>for</strong> diversion <strong>of</strong> water<br />

- erosion and sedimentation control<br />

- excavation, removal and disposal, at an approved <strong>of</strong>f-site location, <strong>of</strong> excavated materials<br />

- extension <strong>of</strong> s<strong>to</strong>rm drainage facilities<br />

- removal <strong>of</strong> submerged upstream c<strong>of</strong>ferdam materials left from previous projects<br />

- removal <strong>of</strong> piers and o<strong>the</strong>r submerged remains <strong>of</strong> previous developments<br />

- mitigative measures that may are found necessary upon inspection <strong>of</strong> <strong>the</strong> lowered<br />

reservoir area<br />

- water control structure<br />

- final design planning<br />

- construction management<br />

- permitting<br />

- contingencies<br />

Operation & maintenance: anticipated schedule and costs <strong>of</strong> routine operations and<br />

maintenance <strong>of</strong> <strong>the</strong> bypass channel, control structure and o<strong>the</strong>r design features<br />

Preliminary engineering design drawings:<br />

The preliminary design drawings will include <strong>the</strong> existing conditions plans (preferably 50scale<br />

plans or smaller scale), plan view sheets (with centerline and station numbers) <strong>of</strong><br />

channel and cross vane structures, channel pr<strong>of</strong>ile (tied in<strong>to</strong> station numbers), cross<br />

sections <strong>of</strong> <strong>the</strong> channel (at <strong>the</strong> cross vane locations and some areas between cross vanes)<br />

and over<strong>to</strong>p floodplain, and details <strong>of</strong> <strong>the</strong> water control structure, s<strong>to</strong>ne sizes and<br />

composition, and sequence <strong>of</strong> construction notes. The channel design should take in<strong>to</strong><br />

account not only low flow conditions, but how weaker-swimming fishes (e.g., juvenile eels)<br />

may be accommodated in <strong>the</strong> design (e.g., near shore rock or log structures) during at least<br />

normal flows. Any needs <strong>for</strong> floodplain and channel bank (re)vegetation should be included<br />

as part <strong>of</strong> a planting plan in <strong>the</strong> preliminary plan set. Lastly, <strong>the</strong> consultant should be<br />

encouraged <strong>to</strong> include any public safety measures in <strong>the</strong> plans, as needed.<br />

The consultant will be expected <strong>to</strong> provide all in<strong>for</strong>mation <strong>to</strong> develop and complete <strong>the</strong><br />

preliminary design plans. The plans will likely consist <strong>of</strong> six or more sheets (plans should be<br />

annotated with symbol legend and key design parameters – including operating flows, water<br />

surface elevations, and velocities):<br />

1. Existing conditions plan depicting <strong>to</strong>pography and bathymetry <strong>of</strong> <strong>the</strong> project site area, as<br />

well as head pond and tailwater surface elevations, flagged wetland boundaries, existing<br />

infrastructure, soil boring locations, and o<strong>the</strong>r natural or man-made features potentially<br />

affecting or affected by project design.<br />

2. Scaled plan view <strong>of</strong> <strong>the</strong> preferred design alternative, depicting dimensions, expected<br />

channel geometry/sinuosity, channel grade slope and bank slopes, rock material, instream<br />

grade control structures, water control structure, and o<strong>the</strong>r important features.<br />

3. Pr<strong>of</strong>ile and cross-section views <strong>of</strong> bypass channel and structures, including low flow<br />

channel, overbank floodplain grades, and expected water levels in bypass during low,<br />

normal and high operating flows and flood flows. The cross sections <strong>of</strong> cross weir structures<br />

will also be provided.<br />

Details <strong>of</strong> temporary water diversion and/or water control, channel and rock materials (sizes<br />

and composition), water control structure, entranceway (in relation <strong>to</strong> existing dam and<br />

PRFP Page 288