08.12.2012 Views

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

Operational Plan for the Restoration of Diadromous Fishes to the ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mattaceunk Project. FERC No. 2520. Great Nor<strong>the</strong>rn Paper, Inc., Millinocket, Maine.<br />

ii + 78 pp. + Appendices.<br />

Great Nor<strong>the</strong>rn Paper, Inc. 1997. 1997 Report on <strong>the</strong> Effectiveness <strong>of</strong> <strong>the</strong><br />

Permanent Downstream Passage System <strong>for</strong> Atlantic Salmon at Weldon Dam.<br />

Mattaceunk Project. FERC No. 2520. Great Nor<strong>the</strong>rn Paper, Inc., Millinocket, Maine.<br />

ii + 61 pp. + Appendices.<br />

Great Nor<strong>the</strong>rn Paper, Inc. 1998. 1998 Report on <strong>the</strong> Effectiveness <strong>of</strong> <strong>the</strong><br />

Permanent Downstream Passage System <strong>for</strong> Atlantic Salmon at Weldon Dam. Great<br />

Nor<strong>the</strong>rn Paper, Inc., Millinocket, Maine. iii + 36 pp. + Appendices.<br />

Great Nor<strong>the</strong>rn Paper, Inc. 1999. 1999 Report on <strong>the</strong> Effectiveness <strong>of</strong> Permanent<br />

Downstream Passage Facilities <strong>for</strong> Atlantic Salmon Weldon Dam. Mattaceunk<br />

Project, FERC No. 2520. Great Nor<strong>the</strong>rn Paper, Inc., Millinocket, Maine. 32 pp. +<br />

Appendices.<br />

Hall, S.D. and S.L. Shepard. 1990a. 1989 Progress Report <strong>of</strong> Atlantic Salmon Kelt<br />

Radio Telemetry Investigations on <strong>the</strong> Lower Penobscot River. Bangor Hydro-<br />

Electric Co., Bangor, Maine. 30 pp.<br />

Hall, S.D. and S.L. Shepard. 1990b. Report <strong>for</strong> 1989 Evaluation Studies <strong>of</strong><br />

Upstream and Downstream Facilities at <strong>the</strong> West Enfield Project (FERC No. 2600).<br />

Bangor-Pacific Hydro Associates. 17 pp. + Appendices.<br />

Shepard, S.L. 1988. 1988 Progress Report: Atlantic Salmon Kelt Radio Telemetry<br />

Investigations in <strong>the</strong> Lower Penobscot River. Bangor Hydro-Electric Co., 32 pp. +<br />

Appendices<br />

Shepard, S.L. 1991a. Report on Radio Telemetry Investigations <strong>of</strong> Atlantic Salmon<br />

Smolt Migration in <strong>the</strong> Penobscot River. Bangor Hydro-Electric Co., 38 pp. +<br />

Appendices.<br />

Shepard, S.L. 1991b. Evaluation <strong>of</strong> Upstream and Downstream Fish Passage<br />

Facilities at <strong>the</strong> West Enfield Project (FERC No. 2600). Bangor-Pacific Hydro<br />

Associates, 25 pp. + Appendices. (Note: fall 1989 and spring 1990 studies).<br />

Shepard, S.L. 1991c. Evaluation <strong>of</strong> Upstream and Downstream Fish Passage<br />

Facilities at <strong>the</strong> West Enfield Project (FERC No. 2600). Bangor-Pacific Hydro<br />

Associates, 27 pp. + Appendices. (Note: spring and fall 1991 studies).<br />

Shepard, S.L. 1993. Survival and Timing <strong>of</strong> Atlantic Salmon Smolts Passing <strong>the</strong><br />

West Enfield Hydroelectric Project. Bangor-Pacific Hydro Associates. 27 pp.<br />

PRFP Page 204

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!