WEST ENFIELD (FERC No. 2600)<br />

Project Description<br />

Project Works: 363’ long x 39’ high ogee spillway plus 6’ high flashboards; 45’ long<br />

non-overflow spillway; 107’ long gated spillway.<br />

Turbines: 2 Turbine Type: Pit Type (horizontal Kaplan turbines)<br />

Generating Capacity: 13 MW<br />

Hydraulic Capacity: 9,000 cfs<br />

Downstream Passage System<br />

Years Studied: 1990 – 1994 (smolts) Life Stages Studied: smolts; kelts<br />

1990 (kelts)<br />

Permanent Bypass System: weirs (5) plus transport flume; system installed when<br />

project redeveloped in 1988.<br />

Study Methods: radio telemetry<br />

Collection Efficiency: Smolts -2% - 36%; five years combined – 17% (N = 259)<br />

Kelts – 4% (spring study, N = 23)<br />

Turbine Survival: 97.7% (acute mortality 2.3%, smolts, Shepard 1993); estimated<br />

at 95% (acute mortality 5%, smolts, ASAL Model).<br />

Downstream Passage Routes: turbines, downstream passage system, spillway,<br />

and gates<br />

PRFP Page 200