17.4.3<br />

17.4.4<br />

17.4.5<br />

17.5.1<br />

17.5.2<br />

17.5.3<br />

17.5.4<br />

17.5.5<br />

17.6.1<br />

17.6.2<br />

17.6.3<br />

17.6.4<br />

Develop assessment study plans,<br />

conduct fish passage efficiency<br />

studies, and develop<br />

recommendations <strong>for</strong> fish passage<br />

improvements at remaining tributary<br />

dams December-45<br />

Complete fish passage<br />

improvements based on passage<br />

efficiency studies December-47<br />

MDMR, USFWS,<br />

NOAA, Hydro<br />

Opera<strong>to</strong>rs, Dam<br />

Owners $185,040<br />

Hydro Opera<strong>to</strong>rs,<br />

Dam Owners,<br />

USFWS, NOAA,<br />

MDMR $15,420<br />

Assess fish passage facility<br />

MDMR, USFWS,<br />

NOAA, Hydro<br />

Opera<strong>to</strong>r, Dam<br />

improvements<br />

Review FERC license and Lower<br />

Penobscot River Multiparty<br />

Settlement Agreement (MPA) <strong>for</strong><br />

December-50 Owner $185,040<br />

specific fish passage deliverables at<br />

Included in<br />

Howland<br />

Review existing fish passage studies<br />

<strong>for</strong> juvenile and adult American eel<br />

April-10 MDMR<br />

16.1.1<br />

undertaken within <strong>the</strong> Penobscot<br />

Included in<br />

River watershed<br />

Develop assessment study plans,<br />

April-10 MDMR<br />

16.2.2<br />

conduct fish passage efficiency<br />

MDMR, USFWS,<br />

studies, and develop<br />

NOAA, Hydro<br />

recommendations <strong>for</strong> fish passage<br />

Opera<strong>to</strong>r, Dam<br />

improvements at Howland December-15 Owner $7,710<br />

Complete fish passage<br />

improvements based on passage<br />

efficiency studies December-17<br />

Hydro Opera<strong>to</strong>r,<br />

Dam Owner,<br />

USFWS, NOAA,<br />

MDMR $3,855<br />

Assess fish passage facility<br />

MDMR, USFWS,<br />

NOAA, Hydro<br />

Opera<strong>to</strong>r, Dam<br />

improvements<br />

Review FERC licenses and FERC<br />

license exemptions <strong>for</strong> specific fish<br />

December-20 Owner $7,710<br />

passage deliverables at remaining<br />

Included in<br />

tributary dams<br />

Review need and process <strong>to</strong><br />

increase upstream and downstream<br />

April-10 MDMR<br />

16.1.1<br />

fish passage efficiency at FERC non-<br />

Included in<br />

jurisdictional dams<br />

Review existing fish passage studies<br />

<strong>for</strong> juvenile and adult American eel<br />

April-10 MDMR<br />

17.1.2<br />

undertaken within <strong>the</strong> Penobscot<br />

Included in<br />

River watershed April-10 MDMR<br />

16.2.2<br />

Utilize annual boat electr<strong>of</strong>ishing<br />

surveys <strong>to</strong> determine requirement<br />

and assessment timeline <strong>for</strong> fish<br />

passage facilities at remaining Annually<br />

MDMR, MDIFW,<br />

USFWS, NOAA $2,500,000<br />

PRFP Page 62