that address fish passage. Similarly, <strong>the</strong> MPA contains specific language on fish<br />

passage provisions that could affect timelines listed in <strong>the</strong> work plan. Additionally,<br />

<strong>the</strong> MPA spells out specific fish passage strategies depending on whe<strong>the</strong>r <strong>the</strong><br />

Veazie and Great Works dams are removed and <strong>the</strong> Howland Dam is bypassed as<br />

well as <strong>to</strong> which entity would be responsible <strong>for</strong> funding, installing, and operating <strong>the</strong><br />

fish passage facilities.<br />

17.1.2 Review Need and Process <strong>to</strong> Increase Upstream and Downstream Fish<br />

Passage Efficiency at FERC Non-Jurisdictional Dams Located on Tributaries<br />

<strong>for</strong> Juvenile and Adult Atlantic Salmon<br />

There is at least one FERC non-jurisdictional dam on Penobscot River tributaries,<br />

<strong>the</strong> Guil<strong>for</strong>d Dam located on <strong>the</strong> Piscataquis River, which is critical <strong>for</strong> passage <strong>of</strong><br />

target res<strong>to</strong>ration fish species. How fish passage improvements are addressed at<br />

this dam needs <strong>to</strong> be explored <strong>to</strong> develop options and approaches <strong>to</strong> ensure fish<br />

passage facilities meet established goals.<br />

17.1.3 Review Existing Fish Passage Studies and Migration/Movement<br />

Undertaken within <strong>the</strong> Penobscot River Watershed <strong>for</strong> Juvenile and Adult<br />

Atlantic Salmon<br />

Over <strong>the</strong> past 20 years, <strong>the</strong>re have been several studies undertaken by hydro dam<br />

opera<strong>to</strong>rs, University <strong>of</strong> Maine graduate students, <strong>the</strong> Maine Atlantic Salmon<br />

Commission, and o<strong>the</strong>rs attempting <strong>to</strong> determine <strong>the</strong> efficiency <strong>of</strong> fish passage<br />

facilities <strong>for</strong> juvenile and adult Atlantic salmon and <strong>to</strong> understand inriver movements<br />

<strong>of</strong> adult and juvenile Atlantic salmon. Passage at tributary dams and inriver<br />

movements/migrations <strong>for</strong> o<strong>the</strong>r anadromous fish species have not been studied in<br />

Penobscot River tributaries. There is a need <strong>to</strong> syn<strong>the</strong>size <strong>the</strong> Atlantic salmon<br />

in<strong>for</strong>mation <strong>to</strong> provide <strong>for</strong> baseline conditions and <strong>to</strong> in<strong>for</strong>m future passage studies<br />

<strong>for</strong> Atlantic salmon.<br />

17.1.4 Develop Assessment Study <strong>Plan</strong>s, Conduct Fish Passage Efficiency<br />

Studies, and Develop Recommendations <strong>for</strong> Fish Passage Improvements <strong>for</strong><br />

Juvenile and Adult Atlantic Salmon<br />

Not all existing fish passage facilities and/or operational measures (e.g. cycling<br />

turbines, opening sluice gates, temporary shutdown <strong>of</strong> generation) have been<br />

assessed <strong>for</strong> <strong>the</strong> passage <strong>of</strong> juvenile and adult Atlantic salmon. Studies <strong>of</strong> existing<br />

fish passage facilities will need <strong>to</strong> be undertaken <strong>to</strong> fur<strong>the</strong>r understand bottlenecks<br />

and/or poor per<strong>for</strong>mance <strong>of</strong> existing fish passage facilities <strong>to</strong> make <strong>the</strong>m more<br />

effective in successfully passing Atlantic salmon adults, smolts, and kelts around<br />

tributary hydro projects and non-hydro dams. Any newly constructed fish passage<br />

facilities, including <strong>the</strong> Howland nature-like bypass, will need <strong>to</strong> undergo rigorous<br />

testing <strong>to</strong> ensure <strong>the</strong>y function properly and are effective in passing <strong>the</strong> target<br />

res<strong>to</strong>ration fish species. All studies should be undertaken over <strong>the</strong> course <strong>of</strong> a<br />

minimum <strong>of</strong> three field seasons<br />

17.1.5 Complete Fish Passage Improvements Based on Passage Efficiency<br />

Studies<br />

PRFP Page 69