das Bild des Hafens ändern, sodass die vom Arbeitsaufwand<br />

her schwersten Aufgaben im Westhafen durchgeführt<br />

werden, also am nördlichen Teil der Einfahrt, während<br />

die Fischkutter mit Speisefisch weiterhin zur Auktionshalle<br />

an der Südseite fahren, und auch der Badestrand – der<br />

neue, lagunenförmige Südstrand mit Rettungsschwimmern<br />

während der Hochsaison – wird auf der Südseite der<br />

Einfahrt liegen.<br />

e n g l i s h<br />

The harbour in Hvide Sande is in the process of being<br />

expanded. The three big wind turbines – Vestas turbines<br />

140 metres high – were erected in December 2011 to<br />

contribute to the new harbour facilities. Work is in progress<br />

to upgrade the <strong>Ringkøbing</strong>-Hvide Sande road to national<br />

status – a necessary step in the construction of a unified<br />

national transport network connected with the harbour<br />

expansion, under which both jetties will be extended, and<br />

a new harbour, “Vesthavnen”, will be constructed north of<br />

the entrance. A 150 metre-long and 35 metre-wide pier/<br />

street for the handling of heavy goods and the entrance<br />

will be excavated to a depth of 6 metres from the present<br />

4.5. The heavy current cables underneath the entrance<br />

have been relaid to a safe depth for the ships.<br />

The artwork “Vestled” will be further developed before the<br />

end of the construction work in 2013, and there are hopeful<br />

plans for a bicycle/walking path to connect the nature<br />

path, which now opens into the street Fabriksvej, and the<br />

path system at Parallelvej/Troldbjergvej. All this will change<br />

the general layout of the harbour so that all heavy work<br />

will proceed largely at the west harbour – the north side<br />

of the entrance, while the fishing boats with edible fish will<br />

continue to moor at the auction hall on the south side. The<br />

swimming beach – the new lagoon-like south beach with<br />

lifesavers during the peak season – will also be south of<br />

the approach.<br />

21<br />

h av n e-u Dv i D e l s e n/haf e n e r w e i t e r u n g/th e har b o u r expa n s i o n

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!