02.04.2013 Views

The impact of urban groundwater upon surface water - eTheses ...

The impact of urban groundwater upon surface water - eTheses ...

The impact of urban groundwater upon surface water - eTheses ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MONITORING NETWORKS AND METHODS<br />

(Gabriel, 1993). <strong>The</strong> hole was covered with a standard 13x13 cm stop-cock cover. Many <strong>of</strong><br />

the holes are no longer accessible but at least 30 remained open during the course <strong>of</strong> the<br />

project.<br />

<strong>The</strong> second set <strong>of</strong> piezometers was drilled during summer 2000 as part <strong>of</strong> the Environment<br />

Agency River Tame Asset Survey. <strong>The</strong> holes (ID 150 mm) were drilled to depths <strong>of</strong> up to<br />

10.5m by light percussion rigs within 15 metres <strong>of</strong> the riverbank. Completion was similar to<br />

that employed in the Severn Trent holes with the response zones ranging from 1 to 3 metres in<br />

width (Caudell, 2000).<br />

A total <strong>of</strong> 20 shallow piezometers were sampled representing ten point samples adjacent to<br />

the river and ten across the northern side <strong>of</strong> the Tame Valley up to 2 km from the river.<br />

In Sutton Park, four shallow piezometers were sampled (Figure 4.3). <strong>The</strong>se formed part <strong>of</strong> a<br />

network installed by South Staffordshire Water Company to monitor the effect <strong>of</strong> a nearby<br />

public supply well.<br />

4.5.2.1 Sampling methods<br />

A low-flow Waterra pump was used with HDPE tubing (ID 10mm, OD 13mm) and stainless<br />

steel ball valves. Dedicated tubing was used for each hole and left in place between sampling.<br />

A total <strong>of</strong> three ball valves were used and rotated between each site, those not in use were<br />

soaked in distilled <strong>water</strong>. If possible, three well volumes (inclusive <strong>of</strong> the gravel pack) were<br />

purged prior to sampling but this was not always possible owing to the slow recovery time <strong>of</strong><br />

some piezometers. In each case a note was made <strong>of</strong> the purged volumes. Samples for<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!