19.05.2013 Views

Chapter 26 - City of Punta Gorda

Chapter 26 - City of Punta Gorda

Chapter 26 - City of Punta Gorda

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 14.4. Establishment <strong>of</strong> Development Permit<br />

A development permit shall be required in conformance with the provisions <strong>of</strong><br />

this ordinance prior to the commencement <strong>of</strong> any development activities.<br />

Section 14.5. Warning and Disclaimer <strong>of</strong> Liability<br />

The degree <strong>of</strong> flood protection required by this Article is considered reasonable<br />

for regulatory purposes and is based on scientific and engineering consideration.<br />

Larger floods can and will occur on rare occasions. Flood heights may be increased by<br />

man-made or natural causes. This Article does not imply that land outside the areas<br />

<strong>of</strong> special flood hazard or uses permitted within such areas will be free from flooding<br />

or flood damages. This Article shall not create liability on the part <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Punta</strong><br />

<strong>Gorda</strong>, Florida or any <strong>of</strong>ficer or employee there<strong>of</strong> for any flood damages that result<br />

from reliance on this ordinance or any administrative decision lawfully made<br />

thereunder.<br />

Section 14.6. Administration<br />

Prior to any development activities, information shall be submitted, following<br />

the requirements <strong>of</strong> this ordinance, indicating the nature, location, dimensions, and<br />

elevations <strong>of</strong> the area in question, existing and proposed structures, fill, storage <strong>of</strong><br />

materials, drainage facilities, and the location <strong>of</strong> the foregoing. Specifically, the<br />

following information is required:<br />

(a) Proposed Lowest Floor. Elevation in relation to mean sea level <strong>of</strong> the proposed<br />

lowest floor, including basement, <strong>of</strong> all structures.<br />

(b) Non-residential Structures. Elevation in relation to mean sea level to which any<br />

non-residential structure will be flood-pro<strong>of</strong>ed.<br />

(c) Flood-pro<strong>of</strong>ing Certification. Certificate from a registered pr<strong>of</strong>essional engineer<br />

or architect that the non-residential flood-pro<strong>of</strong>ed structure will meet the<br />

flood-pro<strong>of</strong>ing criteria <strong>of</strong> Section 14.11.(c).<br />

(d) Watercourse Alteration. Description <strong>of</strong> the extent to which any watercourse will<br />

be altered or relocated as a result <strong>of</strong> proposed development.<br />

(e) Floor Elevation or Flood-pro<strong>of</strong>ing. Provide a floor elevation or flood-pro<strong>of</strong>ing<br />

certification after the lowest floor is completed, or in instances where the<br />

structure is subject to the regulations applicable to Coastal High Hazard Areas,<br />

after placement <strong>of</strong> the horizontal structural members <strong>of</strong> the lowest floor. Upon<br />

placement <strong>of</strong> the lowest floor, or flood-pro<strong>of</strong>ing by whatever construction<br />

means, or upon placement <strong>of</strong> the horizontal structural members <strong>of</strong> the lowest<br />

floor, which ever is applicable, it shall be the duty <strong>of</strong> the permit holder to submit<br />

to the Building Official a certification <strong>of</strong> the elevation <strong>of</strong> the lowest floor, floodpro<strong>of</strong>ed<br />

elevation, or the elevation <strong>of</strong> the lowest portion <strong>of</strong> the horizontal<br />

structural members <strong>of</strong> the lowest floor, whichever is applicable, as built, in<br />

relation to mean sea level. Said certification shall be prepared by or under the<br />

direct supervision <strong>of</strong> a registered land surveyor or pr<strong>of</strong>essional engineer and<br />

<strong>26</strong>-152

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!