cost indicator (LCC)<br />

low high<br />

4<br />

3<br />

2<br />

1<br />

0<br />

-4 -3 -2 -1 0 1 2 3 4<br />

-1<br />

-2<br />

-3<br />

-4<br />

low high<br />

environmental indicator (kWh)<br />

Figure 65: Uncertainty, category Slow<br />

248<br />

more eco-efficient<br />

BaseCase Option 3<br />

Option 4 Option 2<br />

Option 5 Option 6<br />

Option 10 Option 7<br />

Option 8 BNAT<br />

Option 12 Option 9<br />

Option 13 combination 1<br />

Option 11 BAT (comb 2)<br />

When accounting with this magnitude of uncertainty almost none of the individual options can<br />

be favoured comparing one to another, and contribute to the total saving in the same order of<br />

magnitude having non-substantial differences. In some cases option 11 (electronically<br />

dimmable ballasts) and option 13 (HPM replacement with HPS and CMH) and of course<br />

simultaneous implementation of different options clearly demonstrate substantial savings<br />

compared to BAU.<br />

8.1.3.3 Accuracy of the estimated EU25-total energy consumption<br />

It is important to note that there is an uncertainty on the estimated EU25-total energy<br />

consumption and the related scenarios. The main origin is the lack of data about installed stock,<br />

the related long service time of the stock products and the wide variety in new products<br />

performance and future consumer needs.<br />

The following main uncertainties can be identified that have an impact on the calculated E25<br />

energy consumption:<br />

1. Uncertainty regarding assumed wattage per luminaire for the base cases.<br />

2. Uncertainty regarding base case parameters (see chapter 5)<br />

3. Uncertainty regarding % road lit in category slow traffic versus mixed traffic<br />

4. Uncertainty regarding number of luminaires in the installed base (current<br />

assumption 56 mio.)<br />

5. Uncertainty regarding % road infrastructure growth<br />

6. Uncertainty regarding burning hours<br />

7. Uncertainty regarding expected luminaire life and pole life that affect the ratio of<br />

luminaire replacement sales versus new <strong>street</strong> project sales