11.08.2013 Views

Final Report Lot 9: Public street lighting - Amper

Final Report Lot 9: Public street lighting - Amper

Final Report Lot 9: Public street lighting - Amper

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17. What is the ratio between <strong>lighting</strong> points that are connected to a separate <strong>street</strong> <strong>lighting</strong> network and those directly connected to the<br />

residential network?<br />

connection of <strong>street</strong> <strong>lighting</strong> directly connected to<br />

cat f (fast)<br />

cat m (mixed)<br />

cat s (slow)<br />

18. What is the number of <strong>lighting</strong> points operating all night and what is average operating time per year (in hours) for installations with<br />

interim switch off?<br />

Cat F (fast)<br />

Cat M (mixed)<br />

Cat S (slow)<br />

Lighting points operating entire night (%)<br />

306<br />

Average operating hours/year for lamps with<br />

interim switch off

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!