dia/ 4.5 Kg/Cm2. Total Qty 10 mtr<br />
(b) 06 <strong>in</strong> nos. M/E S/W suction (MS Galv) pipes/ 50<br />
dia/ 4.5 Kg/Cm2. Total Qty 15<br />
(c) 16 <strong>in</strong> nos. S/W system MS pipes & Tpiece/ 40<br />
dia/ 4.5 Kg/Cm2. Total Qty 50<br />
(d) 05 <strong>in</strong> nos. M/E F/W system MS pipe/ 50 dia/ 4.5<br />
Kg/Cm2. Total Qty 30<br />
(e) 04 <strong>in</strong> nos. M/E F/W system MS pipe/ 25 dia / 4.5<br />
Kg/Cm2. Total Qty 20 mtr<br />
(f) 10 <strong>in</strong> nos. Fire ma<strong>in</strong> system MS pipes/ 50 dia/<br />
10.5kg/cm2. Total Qty 20 mtr<br />
(g) 30 <strong>in</strong> nos. GS/ Bilge S/W system MS pipes /<br />
50dia / 4.5 Kg/cm2. Total Qty 80 mtr<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 19 OF22<br />
(h) 02 <strong>in</strong> nos. Fuel fill<strong>in</strong>g system MS pipes/ 50dia /<br />
10 kg/cm2. Total Qty 20 mtr<br />
(j) 05 <strong>in</strong> nos. Fuel system MS pipes/ 32dia/ 10<br />
kg/cm2. Total Qty 30 mtr<br />
(k) 05 <strong>in</strong> nos. Fuel/LO system MS pipes/ 20 dia/ 10<br />
kg/cm2. Total Qty 25 mtr<br />
(l) 20 <strong>in</strong> nos. vent MS pipes up rout<strong>in</strong>g from deck/<br />
50dia / 02 kg/cm2 Total Qty 20 mtr<br />
(m) 20 <strong>in</strong> no copper pipes/ 08 dia. Total Qty 20 mtr<br />
Activity Description Remove the Pipes (129 Nos.<br />
) from their location prior permission of ss. Procure<br />
MS pipes (Hot Dip Galvanized) size – 80mm,50<br />
mm, 40mm and 25 mm. MS Pipes 50mm,32 mm<br />
and 20 mm, Copper pipes 08 mm. Flange mat mild<br />
steal Each Heat No. of pipes to be tested <strong>in</strong> NABL<br />
lab for chemical and physical analysis <strong>in</strong> presence<br />
of QC rep. On receipt of satisfactory lab report the<br />
pipes to be manufactured as per sample by us<strong>in</strong>g<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 102/127