06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

p<br />

q<br />

­ Similar jobs <strong>in</strong> mar<strong>in</strong>e field<br />

­ Similar jobs<br />

Details of Dockyard facilities that will be made<br />

available to the Contractor (such as crane,<br />

electricity, compressed air, crane)<br />

Note for user department:­<br />

1. Details of services that will be provided<br />

need to be elaborated.<br />

2. Necessary confirmation from the concerned<br />

department provid<strong>in</strong>g the service that the<br />

same will be made available needs to be<br />

placed on file.<br />

Suggested stages of completion and terms of<br />

payment<br />

and hull of a craft of m<strong>in</strong>imum<br />

200 tons displacement.<br />

Crane, electricity, compressed<br />

air will be provided by<br />

<strong>dockyard</strong>.<br />

1. 25% on completion of<br />

version I of dry dock<strong>in</strong>g,<br />

provided all u/w steel renewal<br />

except for Ver I dock block<br />

areas is completed with WCC<br />

signed by MYCM and MYC&R.<br />

2. 25% on completion of<br />

Version II of dry dock<strong>in</strong>g, with<br />

WCC signed by MYCM and<br />

MYC&R.<br />

r<br />

List of Specifications/draw<strong>in</strong>gs, as applicable<br />

(Specifications and draw<strong>in</strong>gs to be attached if<br />

applicable)<br />

s Tech<strong>nic</strong>al details with tech<strong>nic</strong>al parameters NA<br />

3. 50% On completion of<br />

sea trials and all DLs and pa<strong>in</strong>t<br />

manufacturers performance<br />

guarantee for underwater and<br />

<strong>in</strong>ternal pa<strong>in</strong>t scheme along<br />

with purchase voucher of pa<strong>in</strong>t<br />

to be submitted to user<br />

department WCC duly signed<br />

by MYCM.<br />

NA<br />

t Requirement of tra<strong>in</strong><strong>in</strong>g/on­job tra<strong>in</strong><strong>in</strong>g NO<br />

U Requirement of <strong>in</strong>stallation / commission<strong>in</strong>g Yes<br />

V Requirement of Factory Acceptance Trials (FAT),<br />

Harbor Acceptance Trails (HAT) and Sea<br />

Acceptance Trials (SAT)<br />

Yes, Harbors Acceptance and<br />

Sea Acceptance Trials (HATs<br />

AND SATS)<br />

W List of Tech<strong>nic</strong>al documentation to be provided by NA<br />

the vendor<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420<br />

11/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!