Details of Dockyard facilities that will be made<br />
available to the Contractor (such as crane,<br />
electricity, compressed air, crane)<br />
Note for user department:<br />
1. Details of services that will be provided<br />
need to be elaborated.<br />
2. Necessary confirmation from the concerned<br />
department provid<strong>in</strong>g the service that the<br />
same will be made available needs to be<br />
placed on file.<br />
Suggested stages of completion and terms of<br />
payment<br />
and hull of a craft of m<strong>in</strong>imum<br />
200 tons displacement.<br />
Crane, electricity, compressed<br />
air will be provided by<br />
<strong>dockyard</strong>.<br />
1. 25% on completion of<br />
version I of dry dock<strong>in</strong>g,<br />
provided all u/w steel renewal<br />
except for Ver I dock block<br />
areas is completed with WCC<br />
signed by MYCM and MYC&R.<br />
2. 25% on completion of<br />
Version II of dry dock<strong>in</strong>g, with<br />
WCC signed by MYCM and<br />
MYC&R.<br />
r<br />
List of Specifications/draw<strong>in</strong>gs, as applicable<br />
(Specifications and draw<strong>in</strong>gs to be attached if<br />
applicable)<br />
s Tech<strong>nic</strong>al details with tech<strong>nic</strong>al parameters NA<br />
3. 50% On completion of<br />
sea trials and all DLs and pa<strong>in</strong>t<br />
manufacturers performance<br />
guarantee for underwater and<br />
<strong>in</strong>ternal pa<strong>in</strong>t scheme along<br />
with purchase voucher of pa<strong>in</strong>t<br />
to be submitted to user<br />
department WCC duly signed<br />
by MYCM.<br />
NA<br />
t Requirement of tra<strong>in</strong><strong>in</strong>g/onjob tra<strong>in</strong><strong>in</strong>g NO<br />
U Requirement of <strong>in</strong>stallation / commission<strong>in</strong>g Yes<br />
V Requirement of Factory Acceptance Trials (FAT),<br />
Harbor Acceptance Trails (HAT) and Sea<br />
Acceptance Trials (SAT)<br />
Yes, Harbors Acceptance and<br />
Sea Acceptance Trials (HATs<br />
AND SATS)<br />
W List of Tech<strong>nic</strong>al documentation to be provided by NA<br />
the vendor<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />
11/127