30<br />
31<br />
32<br />
Chalk test on renewed<br />
rubber<br />
WOODEN<br />
UPHOLSTERY<br />
Wooden deck floor<strong>in</strong>g to<br />
be surveyed and renewed<br />
as per exist<strong>in</strong>g<br />
Internal wooden planks<br />
for cargo hold<br />
Survey to be<br />
carried by MOUT<br />
As per SOW<br />
(Specification of<br />
wood to be used<br />
should be given<br />
by user dept)<br />
2 3 3<br />
4<br />
2 3 3<br />
Planks to be <strong>in</strong>spected<br />
prior fitment by QC<br />
NAVAL DOCKYARD MUMBAI<br />
DOC CODE Q C H 7 4 Q A P 0 3 8<br />
DEPT : MQC ( HULL) C NO 74 ISSUE<br />
NO 02<br />
DATE : 22 APR 09 PAGE 7 OF 9<br />
33<br />
34<br />
35<br />
Application of<br />
wooden primer<br />
and f<strong>in</strong>ish coat<br />
Sal wood wedges<br />
for secur<strong>in</strong>g cargo<br />
hold canvas<br />
PVC coated<br />
canvas covers for<br />
cargo hold<br />
SURFACE<br />
PREPARATION &<br />
PAINTING<br />
36 The areas to be<br />
blasted should be<br />
surface prepared<br />
to SA 2.5 and<br />
appropriate pa<strong>in</strong>t<br />
scheme is<br />
As per SOW 2 3 3<br />
As per SOW<br />
(Specification<br />
of wood to be<br />
used should<br />
be given by<br />
user dept)<br />
As per sample<br />
NCD 1453<br />
2 3 3<br />
2 3 3<br />
Prior<br />
application<br />
surface to be<br />
prepared<br />
Wood to be<br />
<strong>in</strong>spected prior<br />
fitment by QC<br />
Specification of<br />
PVC to be<br />
mentioned by<br />
user<br />
As per SOW 2 3 3 Grit to be used<br />
G24<br />