06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10 Lay<strong>in</strong>g of Portland<br />

Cement and white river<br />

sand <strong>in</strong> the ratio of 1:3 to<br />

obta<strong>in</strong> 40­60 mm<br />

thickness with required<br />

slopes for dra<strong>in</strong>age for<br />

water<br />

11 Inspection post cur<strong>in</strong>g of<br />

the cement layer<br />

12 Material conformity<br />

checks of Tiles<br />

manufactured by H&R<br />

Johnson anti­skid Endura<br />

tiles as per IS<br />

specification. 13755.<br />

Sample to be landed.<br />

13 Lay<strong>in</strong>g of New Tiles and<br />

grout<strong>in</strong>g with white<br />

cement.<br />

As per SOW 1 ­­­ 3 3<br />

3 ­­­ ­­ 3<br />

As per SOW 3 ­­­ 1 3<br />

2 ­­­ 3 3<br />

NAVAL DOCKYARD MUMBAI<br />

DOC CODE Q C H 7 4 Q A P 0 3 8<br />

DEPT : MQC ( HULL) C NO 74 ISSUE<br />

NO 02<br />

DATE : 22 APR 09 PAGE 9 OF 9<br />

14 F<strong>in</strong>al Clean<strong>in</strong>g and Polish<strong>in</strong>g. ­­­ ­­­ ­­­ ,3<br />

F<strong>in</strong>al Inspection of completed<br />

3 ­­ ­ ­­<br />

work<br />

Issue of Work Completion<br />

Certificate<br />

1 ­­ ­­ ­­<br />

N.B. :<br />

1. Above QA do not <strong>in</strong>clude degutt<strong>in</strong>g and re­gutt<strong>in</strong>g which may place at 3 rd and 17 th respectively, where<br />

required.<br />

2. All contractors & yard will follow this draft QA plan for steel (Plate) renewal to prepare their own QA<br />

Plan and submit for approval to QC / M(Fab) before they commence operation.<br />

4. QC Inspectors/ Supervisors must ensure timely preparation of Inspection reports on all the H (Hold)<br />

po<strong>in</strong>ts after due <strong>in</strong>spection on respective hold po<strong>in</strong>t.<br />

5. Legend: A) “P” – Perform, “R” – Review, “W” – Witness, “H” – Hold<br />

B) 1 – MFAB Department, 2 – CONTRACTOR, 3 – QC(H) Department<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 64/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!