naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
suitable for DP Test<br />
approved<br />
equivalent<br />
standards<br />
NAVAL DOCKYARD MUMBAI<br />
DOC CODE Q C H 7 4 Q A P 0 3 8<br />
DEPT : MQC ( HULL) C NO 74 ISSUE<br />
NO 02<br />
DATE : 22 APR 09 PAGE 4 OF 9<br />
(a) Second DP Test,<br />
(b) Exam<strong>in</strong>e defect free<br />
weld and adjo<strong>in</strong><strong>in</strong>g area,<br />
13<br />
(c) Identify and note the<br />
‘X’ Ray spots or locations<br />
approx. 10% of weld<br />
length (Seam + Butts) for<br />
u/w and 5% for a/w,<br />
which can corelate while<br />
<strong>in</strong>terpretation / review of<br />
‘X’ ray film. UT will be<br />
substitute where<br />
radiography not possible.<br />
(a) Interpretation of<br />
radiography film and<br />
justify the ‘X’ Ray report.<br />
1/<br />
2<br />
3 3<br />
14 (b) Action accord<strong>in</strong>gly i.e.<br />
accept or repair (c)<br />
Follow the same (a) if<br />
there is repair but as per<br />
procedure.<br />
Pressure test or leak test<br />
whichever possible or<br />
15<br />
suitable for particular job<br />
will be decided by QC<br />
16 Preservation (<strong>in</strong> and out)<br />
prim<strong>in</strong>g and pa<strong>in</strong>t<strong>in</strong>g after<br />
above all tests are<br />
SB Standard,<br />
ASME Sec IX<br />
SB Standard<br />
1/<br />
2<br />
1/<br />
2<br />
1/<br />
2<br />
3<br />
3<br />
3<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 59/127