06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

suitable for DP Test<br />

approved<br />

equivalent<br />

standards<br />

NAVAL DOCKYARD MUMBAI<br />

DOC CODE Q C H 7 4 Q A P 0 3 8<br />

DEPT : MQC ( HULL) C NO 74 ISSUE<br />

NO 02<br />

DATE : 22 APR 09 PAGE 4 OF 9<br />

(a) Second DP Test,<br />

(b) Exam<strong>in</strong>e defect free<br />

weld and adjo<strong>in</strong><strong>in</strong>g area,<br />

13<br />

(c) Identify and note the<br />

‘X’ Ray spots or locations<br />

approx. 10% of weld<br />

length (Seam + Butts) for<br />

u/w and 5% for a/w,<br />

which can co­relate while<br />

<strong>in</strong>terpretation / review of<br />

‘X’ ray film. UT will be<br />

substitute where<br />

radiography not possible.<br />

(a) Interpretation of<br />

radiography film and<br />

justify the ‘X’ Ray report.<br />

1/<br />

2<br />

3 3<br />

14 (b) Action accord<strong>in</strong>gly i.e.<br />

accept or repair (c)<br />

Follow the same (a) if<br />

there is repair but as per<br />

procedure.<br />

Pressure test or leak test<br />

whichever possible or<br />

15<br />

suitable for particular job<br />

will be decided by QC<br />

16 Preservation (<strong>in</strong> and out)<br />

prim<strong>in</strong>g and pa<strong>in</strong>t<strong>in</strong>g after<br />

above all tests are<br />

SB Standard,<br />

ASME Sec IX<br />

SB Standard<br />

1/<br />

2<br />

1/<br />

2<br />

1/<br />

2<br />

3<br />

3<br />

3<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 59/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!