naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
E20006 Defect Description<br />
If clearance found beyond permissible limits,<br />
withdraw shaft and stern tube bushes (fwd and aft)<br />
carry out follow<strong>in</strong>g repairs as per <strong>in</strong>spection and<br />
recommendation of MQC(quote separately).<br />
(i) Renew stern tube bushes (Mat gun metal with 5<br />
mm thick white metal l<strong>in</strong><strong>in</strong>g, 115x147x362 &<br />
114x148x248 mm length) and mach<strong>in</strong>e the bushes<br />
to reduce the clearance with<strong>in</strong> m<strong>in</strong>imum permissible<br />
limits. ( Quote for port and stbd shaft )<br />
(ii) Check trueness of shafts, carry out metal<br />
build<strong>in</strong>g up / <strong>in</strong>sert sleeves on both journals (fwd &<br />
aft) mach<strong>in</strong>e and journals to be made smooth and<br />
mirror f<strong>in</strong>ish as per MQC <strong>in</strong>struction. Resight shaft<br />
l<strong>in</strong>e and align shaft with respect to gear box.<br />
(iii) Check and renew split roller Plummer bear<strong>in</strong>g<br />
(self align<strong>in</strong>g ball bear<strong>in</strong>gs Type SN 520 Series),<br />
bear<strong>in</strong>g grease to be renewed.)<br />
(iv) Renew bulkhead glands hemp pack<strong>in</strong>g (matgreased<br />
hemp, size 1/2 <strong>in</strong>ch sq x 370 mm long x<br />
08 no, shaft dia 90 mm).<br />
(V) Inspect shaft coupl<strong>in</strong>gs, coupl<strong>in</strong>g key and<br />
keyways, coupl<strong>in</strong>g nut and renew<br />
Activity Description<br />
(i) Removal of stern tube bushes from the hous<strong>in</strong>g,<br />
visual and dimensional <strong>in</strong>spection of the bushes if<br />
damaged renew the bushes and its hous<strong>in</strong>g by<br />
remetal<strong>in</strong>g as per the specification refer OEM<br />
manual for details, mach<strong>in</strong><strong>in</strong>g the bushes as per<br />
sight<strong>in</strong>g if required, check the box<strong>in</strong>g up clearances<br />
of stern bush, pack the <strong>in</strong>ner side gland with hemp<br />
pack<strong>in</strong>g as specified.<br />
(ii) Removal of tail shaft, <strong>in</strong>termediate shaft, visual<br />
and dimensional <strong>in</strong>spection of shaft , key, key slot,<br />
check trueness of the shaft with coupl<strong>in</strong>g, check the<br />
shaft load l<strong>in</strong>e with respect to its bear<strong>in</strong>g. Check the<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 85/127<br />
02<br />
02<br />
02<br />
02<br />
1<br />
1<br />
1<br />
1<br />
1<br />
2<br />
2<br />
<br />
<br />
3<br />
3<br />
3<br />
3<br />
3<br />
3,4<br />
3,4<br />
3,4<br />
3,4<br />
3,4