naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
08 Repair, Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
commission<strong>in</strong>g/Test<strong>in</strong>g<br />
of Shore supply box.<br />
load trials / to be proved.<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g.<br />
vi) Check for new supply box. v) Check for new voltmeter<br />
phone sequence meter OEM range. Meters to be<br />
calibrated.<br />
vi) New material bill/ voucher to be submitted.<br />
vii) Check for test, sequence & performance. To be<br />
proved on board on load<br />
1 2&3 3 3<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 06 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
09 Repair, O/H refurbish,<br />
new <strong>in</strong>stallation and<br />
commission<strong>in</strong>g/Test<strong>in</strong>g<br />
Refer to QAP : QCL074QAP059 for control panels.<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
1 2&3 3 3<br />
of Galley hot plate. & iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
Control panel.<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g.<br />
vi) Overload relay to be calibrated .<br />
vi) New material compartment to be offered the QC<br />
check prior to fitment. vii) Operational performance to<br />
be checked<br />
10 Repair, Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
commission<strong>in</strong>g/Test<strong>in</strong>g<br />
of Alarm, alarm<br />
control panel, Hooter<br />
& Electric Siren,<br />
whistle, Horn.<br />
Refer to QAP : QCL074QAP059 for control panels.<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g.<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 72/127<br />
1 2&3 3 3