naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 8 OF 22<br />
E20013<br />
Activity Description<br />
Dismantle pump completely clean all the parts<br />
visual <strong>in</strong>spection, if any wear, scor<strong>in</strong>g is observed<br />
on the gears the set must be renewed. Scor<strong>in</strong>g<br />
observed on the spool the valve must be renewed,<br />
carry out the <strong>in</strong>ternal leakages test if exceed the<br />
same must be renewed refer the OEM manual for<br />
data. Check the solenoid coil, spr<strong>in</strong>g and seal<br />
renew if require, carryout pa<strong>in</strong>t<strong>in</strong>g post trials.<br />
Defect Description<br />
Overhaul<strong>in</strong>g (3000 Hourly rout<strong>in</strong>es) of air<br />
compressors through authorized dealer only and<br />
offer trials on completion. Prove the compressor<br />
post completion.<br />
Make ELGI, model THPC 300 ). Qty 02<br />
1 3 3<br />
E20015<br />
Activity Description<br />
Dismantle completely, clean all parts, gauge all<br />
bear<strong>in</strong>gs, piston dia, cyl<strong>in</strong>der bore, renew piston<br />
r<strong>in</strong>gs set, clean the LO sump, clean LO level<br />
<strong>in</strong>dicator, <strong>in</strong>termediate cooler, safety valve to be set<br />
to the desired pressure, valve reed to be renewed<br />
along with the spr<strong>in</strong>g plate. Balanc<strong>in</strong>g of the<br />
flywheel, renew the belts if damaged. Carry out<br />
pa<strong>in</strong>t<strong>in</strong>g post trials.<br />
1 3 3<br />
Defect Description<br />
Overhaul<strong>in</strong>g of 02 <strong>in</strong> nos GS Pump. Renewal of<br />
Impellers, shafts, bear<strong>in</strong>g and seals. Prove the<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 90/127