naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
& W<strong>in</strong>d<strong>in</strong>g separately.<br />
xiv) Check for AVR overhaul<strong>in</strong>g, repair<strong>in</strong>g/renewal &<br />
fitment connections, tun<strong>in</strong>g / sett<strong>in</strong>g & Performance.<br />
xv) Check for No load /full load trial performance .<br />
Checks<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 03 OF 14<br />
Sr. ACTIVITY<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
No. DESCRIPTION<br />
SCOPE OF WORK P R W H<br />
electrical parameters like RPM, SPM, vibration, temp,<br />
O/P Volts, frequency, load current should be with<strong>in</strong> limit<br />
as per Alternator tally plate & Alternator QAP:<br />
QCL074QAP001<br />
xvi) Alternator body pa<strong>in</strong>t / rust to be removed. After<br />
clean<strong>in</strong>g Navy grade pa<strong>in</strong>t to be applied before that red<br />
oxide to be used.<br />
xvii) New materials to be offered for QC checks prior<br />
to fitment. Bill voucher to be submitted<br />
02 Repair, refurbishment, Refer to QAP : QCL074QAP058 for Repair & 1 2&3 3 3<br />
new <strong>in</strong>stallation and refurbish of Switch board<br />
commission<strong>in</strong>g/Test<strong>in</strong>g (i) Checks dur<strong>in</strong>g removal and open<strong>in</strong>g <strong>in</strong>spection, Check<br />
of Switch board. for tech<strong>nic</strong>al details of removed / opened switch gears for<br />
any damage /miss<strong>in</strong>g / abnormalities . Check for<br />
serviceability / condition of switch board for to ascerta<strong>in</strong><br />
the serviceability of each components to undertake repair/<br />
overhaul / renewal<br />
ii) Checks dur<strong>in</strong>g overhaul<strong>in</strong>g of switchboard for<br />
cleanness, secure, miss<strong>in</strong>g, defective part and broken.<br />
Defective parts to be renewed as per sample reputed<br />
make/ OEM.<br />
c) Checks for MCB, MCCB, Contractor, rotary switches,<br />
CT, PT relays , fuses assembly, Connector, cable entries,<br />
cables, lugs, lay out, alarm, <strong>in</strong>dications, measur<strong>in</strong>g<br />
<strong>in</strong>struments and switch gears for serviceability. If found<br />
defective to be renewed as per make design.<br />
d) Check for MCCB overhaul<strong>in</strong>g / renewal.<br />
e) Check for rotary switches (heavy duty ) for<br />
renewal/overhaul.<br />
f) Check for <strong>in</strong>ternal wir<strong>in</strong>g<br />
renewal/clean<strong>in</strong>g/secur<strong>in</strong>g/connections.<br />
g) Check for all <strong>in</strong>dications with assembly to be<br />
operation / renewed.<br />
h) Check for fuse assembly & fuses.<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 68/127