06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

& W<strong>in</strong>d<strong>in</strong>g separately.<br />

xiv) Check for AVR overhaul<strong>in</strong>g, repair<strong>in</strong>g/renewal &<br />

fitment connections, tun<strong>in</strong>g / sett<strong>in</strong>g & Performance.<br />

xv) Check for No load /full load trial performance .<br />

Checks<br />

NAVAL DOCKYARD, MUMBAI<br />

TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />

DEPT. :<br />

QC(ELECTRICAL )<br />

C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 03 OF 14<br />

Sr. ACTIVITY<br />

REFERENCE DOCMENT & CHECK LIST INSPECTION<br />

No. DESCRIPTION<br />

SCOPE OF WORK P R W H<br />

electrical parameters like RPM, SPM, vibration, temp,<br />

O/P Volts, frequency, load current should be with<strong>in</strong> limit<br />

as per Alternator tally plate & Alternator QAP:<br />

QCL074QAP001<br />

xvi) Alternator body pa<strong>in</strong>t / rust to be removed. After<br />

clean<strong>in</strong>g Navy grade pa<strong>in</strong>t to be applied before that red<br />

oxide to be used.<br />

xvii) New materials to be offered for QC checks prior<br />

to fitment. Bill voucher to be submitted<br />

02 Repair, refurbishment, Refer to QAP : QCL074QAP058 for Repair & 1 2&3 3 3<br />

new <strong>in</strong>stallation and refurbish of Switch board<br />

commission<strong>in</strong>g/Test<strong>in</strong>g (i) Checks dur<strong>in</strong>g removal and open<strong>in</strong>g <strong>in</strong>spection, Check<br />

of Switch board. for tech<strong>nic</strong>al details of removed / opened switch gears for<br />

any damage /miss<strong>in</strong>g / abnormalities . Check for<br />

serviceability / condition of switch board for to ascerta<strong>in</strong><br />

the serviceability of each components to undertake repair/<br />

overhaul / renewal<br />

ii) Checks dur<strong>in</strong>g overhaul<strong>in</strong>g of switchboard for<br />

cleanness, secure, miss<strong>in</strong>g, defective part and broken.<br />

Defective parts to be renewed as per sample reputed<br />

make/ OEM.<br />

c) Checks for MCB, MCCB, Contractor, rotary switches,<br />

CT, PT relays , fuses assembly, Connector, cable entries,<br />

cables, lugs, lay out, alarm, <strong>in</strong>dications, measur<strong>in</strong>g<br />

<strong>in</strong>struments and switch gears for serviceability. If found<br />

defective to be renewed as per make design.<br />

d) Check for MCCB overhaul<strong>in</strong>g / renewal.<br />

e) Check for rotary switches (heavy duty ) for<br />

renewal/overhaul.<br />

f) Check for <strong>in</strong>ternal wir<strong>in</strong>g<br />

renewal/clean<strong>in</strong>g/secur<strong>in</strong>g/connections.<br />

g) Check for all <strong>in</strong>dications with assembly to be<br />

operation / renewed.<br />

h) Check for fuse assembly & fuses.<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 68/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!