06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(ii) Withdraw shaft and check trueness of shafts,<br />

carry out metal build up / <strong>in</strong>sert sleeves on both<br />

journals (fwd & aft) mach<strong>in</strong>e and journals to be<br />

made smooth and mirror f<strong>in</strong>ish as per MQC<br />

<strong>in</strong>structions. Resight shaft l<strong>in</strong>e and align shaft with<br />

respect to gear box.<br />

(iii) Check and renew split roller Plummer bear<strong>in</strong>g 02 Nos<br />

(self align<strong>in</strong>g ball bear<strong>in</strong>gs Type­ SN 520 Series),<br />

bear<strong>in</strong>g grease to be renewed.)<br />

(iv) Renew bulkhead glands hemp pack<strong>in</strong>g (matgreased<br />

hemp, size­ 1/2 <strong>in</strong>ch sq x 370 mm long x<br />

08 no, shaft dia­ 90 mm).<br />

(v) Inspect shaft coupl<strong>in</strong>gs, coupl<strong>in</strong>g key and<br />

keyways, coupl<strong>in</strong>g nut and renew.<br />

E­20006 Carry out renewal of ‘A’ Bracket thordon bushes<br />

with carrier and correction of eccentricity if any.<br />

Renewal of bushes and mach<strong>in</strong><strong>in</strong>g <strong>in</strong>struction as<br />

per <strong>in</strong>spection report and recommendation of<br />

MQCE.<br />

E­20007 02 <strong>in</strong> nos. sea chest grat<strong>in</strong>g to be opened, Mud<br />

Box/Sea tube to be chipped, cleaned and<br />

<strong>in</strong>spected. Repair / renew as necessary, Anode to<br />

be renewed <strong>in</strong> side mud box/sea tube and to be<br />

pa<strong>in</strong>ted with approved pa<strong>in</strong>t scheme.<br />

E­20008 Overhaul and clean both hydraulic rudder<br />

motor(Type­ HSG TK 70), renew top & bottom oil<br />

seals, piston seals, “O” r<strong>in</strong>gs as per sample and<br />

refit relief valves(set pressure­40 kg/cm2). Prove<br />

the system on board and offer trials. (Make­ Geeta<br />

Engg Works P ltd, Thane).<br />

02 Nos<br />

02 Nos<br />

02 Nos<br />

02 Nos<br />

02 nos<br />

02 Nos<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 37/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!