the QC WWT Lab<br />

viii) Dr bake varnish / coat<br />

varnish to be applied on the w<strong>in</strong>d<strong>in</strong>g. viii) Rotor to<br />

be balanced and trueness checked. Certificate to<br />

be provided . ix) Shaft bear<strong>in</strong>g size to be checked, if<br />

found changes then rotor shaft built up/mach<strong>in</strong>ed<br />

by fabrication & mach<strong>in</strong><strong>in</strong>g.<br />

x) Check rotor bar open / crack / shorted with shaft to be<br />

repaired, if It found beyond then to be renewed as per<br />

design. xi) Check for <strong>in</strong>spection for <strong>in</strong>sulation & proper<br />

assembl<strong>in</strong>g, fitment, alignment and connections.<br />

xiii) Check for term<strong>in</strong>al block, term<strong>in</strong>al connections<br />

cables lugs, cable glands. Check for <strong>in</strong>sulation of Cable<br />

&<br />

NAVAL DOCKYARD, MUMBAI<br />

TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />

DEPT. :<br />

QC(ELECTRICAL )<br />

C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 04 OF 14<br />

Sr. ACTIVITY<br />

No. DESCRIPTION<br />

REFERENCE DOCMENT & CHECK LIST INSPECTION<br />

SCOPE OF WORK P R W H<br />

W<strong>in</strong>d<strong>in</strong>g separately. xiv) Check for No load /full load trial<br />

performance . Checks electrical parameters like RPM,<br />

SPM, vibration, temp, load current should be with<strong>in</strong> limit<br />

as per Motor tally plate & Motor QAP: QCL074QAP001<br />

xv) Motor body pa<strong>in</strong>t / rust to be removed. After clean<strong>in</strong>g<br />

Navy grade pa<strong>in</strong>t to be applied before that red oxide to be<br />

used. xvi) New materials to be offered for QC checks prior<br />

to fitment. Bill voucher to be submitted.<br />

04 Repair, O/H,<br />

refurbishment, new<br />

<strong>in</strong>stallation and<br />

Refer to QAP074QAP059 for Starters and Control panels<br />

i) Visual checks for open<strong>in</strong>g starter for any<br />

damage/miss<strong>in</strong>g/defectives/ abnormalities . ii) Visual<br />

1 2& 3 3<br />

commission<strong>in</strong>g/Test<strong>in</strong>g checks for overhaul<strong>in</strong>g starter defective miss<strong>in</strong>g part to be<br />

renewed as per sample / OEM reputed make & clean<strong>in</strong>g<br />

of AC/DC Motor<br />

tightness secur<strong>in</strong>g connections. iii) Checks for perished<br />

Starters/ Control<br />

wir<strong>in</strong>g renewal as per sample. iv) Check for serviceability<br />

panels<br />

of contractor relay it found defective to be renewed as per<br />

sample/ OEM. v) Overload relay to be calibrated<br />

certificate to be submitted. O/L relay to be calibrated as<br />

per QAP059. vi) Starter box exist<strong>in</strong>g pa<strong>in</strong>t / rust to be<br />

removed & repa<strong>in</strong>ted by navy grade pa<strong>in</strong>t. New gasket to<br />

be fitted. vii) Check for fitment, tightness, connections &<br />

secure of starter. Cable glands to be filled. viii)<br />

Operational performance of starter to be checked.<br />

ix) New spare / material to be offered for QC checks<br />

bill voucher to be submitted.<br />

05 Repair, Overhaul<strong>in</strong>g, i)Visual checks to be offered for check for any damage/ 1 2&3 3 3<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 70/127