the QC WWT Lab<br />
viii) Dr bake varnish / coat<br />
varnish to be applied on the w<strong>in</strong>d<strong>in</strong>g. viii) Rotor to<br />
be balanced and trueness checked. Certificate to<br />
be provided . ix) Shaft bear<strong>in</strong>g size to be checked, if<br />
found changes then rotor shaft built up/mach<strong>in</strong>ed<br />
by fabrication & mach<strong>in</strong><strong>in</strong>g.<br />
x) Check rotor bar open / crack / shorted with shaft to be<br />
repaired, if It found beyond then to be renewed as per<br />
design. xi) Check for <strong>in</strong>spection for <strong>in</strong>sulation & proper<br />
assembl<strong>in</strong>g, fitment, alignment and connections.<br />
xiii) Check for term<strong>in</strong>al block, term<strong>in</strong>al connections<br />
cables lugs, cable glands. Check for <strong>in</strong>sulation of Cable<br />
&<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 04 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
W<strong>in</strong>d<strong>in</strong>g separately. xiv) Check for No load /full load trial<br />
performance . Checks electrical parameters like RPM,<br />
SPM, vibration, temp, load current should be with<strong>in</strong> limit<br />
as per Motor tally plate & Motor QAP: QCL074QAP001<br />
xv) Motor body pa<strong>in</strong>t / rust to be removed. After clean<strong>in</strong>g<br />
Navy grade pa<strong>in</strong>t to be applied before that red oxide to be<br />
used. xvi) New materials to be offered for QC checks prior<br />
to fitment. Bill voucher to be submitted.<br />
04 Repair, O/H,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
Refer to QAP074QAP059 for Starters and Control panels<br />
i) Visual checks for open<strong>in</strong>g starter for any<br />
damage/miss<strong>in</strong>g/defectives/ abnormalities . ii) Visual<br />
1 2& 3 3<br />
commission<strong>in</strong>g/Test<strong>in</strong>g checks for overhaul<strong>in</strong>g starter defective miss<strong>in</strong>g part to be<br />
renewed as per sample / OEM reputed make & clean<strong>in</strong>g<br />
of AC/DC Motor<br />
tightness secur<strong>in</strong>g connections. iii) Checks for perished<br />
Starters/ Control<br />
wir<strong>in</strong>g renewal as per sample. iv) Check for serviceability<br />
panels<br />
of contractor relay it found defective to be renewed as per<br />
sample/ OEM. v) Overload relay to be calibrated<br />
certificate to be submitted. O/L relay to be calibrated as<br />
per QAP059. vi) Starter box exist<strong>in</strong>g pa<strong>in</strong>t / rust to be<br />
removed & repa<strong>in</strong>ted by navy grade pa<strong>in</strong>t. New gasket to<br />
be fitted. vii) Check for fitment, tightness, connections &<br />
secure of starter. Cable glands to be filled. viii)<br />
Operational performance of starter to be checked.<br />
ix) New spare / material to be offered for QC checks<br />
bill voucher to be submitted.<br />
05 Repair, Overhaul<strong>in</strong>g, i)Visual checks to be offered for check for any damage/ 1 2&3 3 3<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 70/127