06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of Intercom System &<br />

Loud hailer/ Broad<br />

cast<strong>in</strong>g/ PI /SRE<br />

System/PA system &<br />

VHF/Telecommu<strong>nic</strong>ation<br />

system. / Television<br />

19 Overhaul<strong>in</strong>g,<br />

refurbishment, new<br />

<strong>in</strong>stallation and<br />

commission<strong>in</strong>g / test<strong>in</strong>g<br />

of W<strong>in</strong>dow wiper<br />

system /motor,<br />

20 Overhaul<strong>in</strong>g,<br />

refurbishment,<br />

renewal ,new <strong>in</strong>stallation<br />

and commission<strong>in</strong>g /<br />

test<strong>in</strong>g of Ma<strong>in</strong> steer<strong>in</strong>g<br />

system & Dash board<br />

panel at Wheel<br />

house/bridge /<br />

Steer<strong>in</strong>g gear system<br />

renewed as per sample / OEM make/ reputed make. iv)<br />

Check for fitment, connection, secure & tightness. New<br />

material bill to be submitted v) If item /equipment found<br />

beyond repair to be renewed as per sample/make/ OEM<br />

make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />

the QC check prior to fitment. vii) Check for Operational<br />

performance of Commu<strong>nic</strong>ation system & full load trials<br />

on board. Viii) Check for system operation as per SOW<br />

& Tech manual ix) Check for fitment & operational test<br />

Test certificate to be provided if any<br />

Refer to QAP : QCL074QAP001 for AC/DC Motor<br />

As per Sl No 03<br />

Refer to QAP : QCL074QAP059 for control panels<br />

i) Visual checks for any defects for serviceability.<br />

ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g /<br />

renewal. iii) Check defective /miss<strong>in</strong>g competent to be<br />

renewed as per sample / OEM make/ reputed make. iv)<br />

Check for fitment, connection, secure & tightness. New<br />

material bill to be submitted v) If item /equipment found<br />

beyond repair to be renewed as per sample/make/ OEM<br />

make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />

the QC check prior to fitment. vii) Measur<strong>in</strong>g <strong>in</strong>struments<br />

1 2&3 3 3<br />

1 2&3 3 3<br />

NAVAL DOCKYARD, MUMBAI<br />

TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />

DEPT. :<br />

QC(ELECTRICAL )<br />

C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 10 OF 14<br />

Sr.<br />

No.<br />

ACTIVITY<br />

REFERENCE DOCMENT & CHECK LIST INSPECTION<br />

DESCRIPTION<br />

SCOPE OF WORK P R W H<br />

to be calibrated viii) Check for Operational performance of<br />

Steer<strong>in</strong>g System & full load trials on board. ixi) Check for<br />

system operation as per SOW & Tech manual ix) Check<br />

for fitment & operational test x) Test certificate to be<br />

provided if any<br />

Refer to QAP : QCL074QAP059 for control panels<br />

i) Visual checks for any defects for serviceability.<br />

ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />

iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />

per sample / OEM make/ reputed make. iv) Check for<br />

21 Overhaul<strong>in</strong>g,<br />

refurbishment,<br />

renewal ,new<br />

<strong>in</strong>stallation and<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 76/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!