naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
kg/cm2 Qty 02<br />
(f) Both M/E S/W suction 3 way plug Valve 50/ 3.5<br />
kg/cm2 Qty 04<br />
(g) Both M/E S/W pump delivery valve 40/ 4.5<br />
kg/cm2 Qty 02<br />
(h) M/E Inter cooler <strong>in</strong>let and outlet valve 40/4.5<br />
kg/cm2 Qty 02<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 16 OF22<br />
(j) Both M/E Emergency cool<strong>in</strong>g SDNR valve 40/<br />
4.5 kg/cm2 Qty 02<br />
(k) D/G SW pumps suc/emg. cool<strong>in</strong>g/ overboard<br />
SDNR valve 32/ 4.5 kg/cm2 Qty 02<br />
(l) Both M/E S/W pump overboard discharge valve<br />
(SDNR)/ 40/ 4.5 kg/cm2 Qty 02<br />
(m) G.S pump & bilge Pump suction and discharge<br />
valve 50/4.5 kg/cm2 Qty 04<br />
(n) Both M/E F/W pp suction valve 50/4.5 kg/cm2<br />
Qty 02<br />
(p) Both M/E F/W dra<strong>in</strong> valve 25/4.5 kg/cm2 Qty 02<br />
(q) Both M/E F/W cooler dra<strong>in</strong> valve 25/ 4.5 kg/cm2<br />
Qty 02<br />
(r) Both M/E & DG Spr<strong>in</strong>g loaded fire safe fuel l<strong>in</strong>e<br />
valve/Fuel Storage Tank Valve15/ 03 kg/cm2 Qty<br />
05<br />
(s) G.S pump valve chest (01 nos x 06 valves on<br />
chest)/50/06/ 4.5 kg/cm2 Qty 06<br />
(t) Bilge pump valve chest (02 No's x 03 valves on<br />
each) 50/ 4.5 kg/cm2 Qty 06<br />
(u) Fire ma<strong>in</strong> l<strong>in</strong>e valve/ GS Pump system valve 50/<br />
07 kg/cm2 Qty 04<br />
(v) Fire hydrant valve 32/ 07 kg/cm2 Qty 12<br />
(w) Fuel fill<strong>in</strong>g valve 50/ 3.5 kg/cm2 Qty 02<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 99/127