xiii)<br />
the User Manager and MYCR<br />
Firm to provide performance guarantee from OEM for pa<strong>in</strong>t<br />
scheme<br />
(D)<br />
CONTRACTOR’S LIABILITY<br />
WELDER QUALIFICATION:<br />
Sl Activity Confirm ability to<br />
meet requirement<br />
(Answer <strong>in</strong> Yes/No)<br />
i) The firm should have qualified welders certified by IRS or<br />
any other weld<strong>in</strong>g society to adhere with Naval structural<br />
standards NES/DGS weld<strong>in</strong>g booklet and should submit<br />
their experience & qualification certificate for tradesmen and<br />
welder, performance qualification (WPQ) certificate to the<br />
<strong>in</strong>spection authority. These welders are required to be<br />
qualified <strong>in</strong> all positions for weld<strong>in</strong>g.<br />
ii) Survey and quality <strong>in</strong>spection for the work be<strong>in</strong>g undertaken<br />
is to be done by MFAB/ MQC(Hull). F<strong>in</strong>al <strong>in</strong>spection after<br />
assembly at the site is to be undertaken both by <strong>dockyard</strong><br />
QC .<br />
iii) Prior to commencement of work, firm has to submit follow<strong>in</strong>g<br />
documents:<br />
(a) QAP for undertak<strong>in</strong>g the job. The extent of NDT is to be<br />
<strong>in</strong>cluded <strong>in</strong> the QA / QC plan.<br />
(b) Welder qualification duly certified by IRS / LRS.<br />
(c) Work can commence on approval of QAP and<br />
acceptance of Welder qualifications and NDT norms by ND<br />
(MB). Delay <strong>in</strong> approval of QAP will be attributable to<br />
Contractor.<br />
(E)<br />
OTHER LIABILITIES<br />
Sl Activity Confirm ability to<br />
adhere to<br />
requirement<br />
(Answer <strong>in</strong> Yes/No)<br />
i) Supply of all types of pa<strong>in</strong>ts as specified <strong>in</strong> the SOW<br />
ii) Gas cutt<strong>in</strong>g /weld<strong>in</strong>g equipment & materials/ Electrodes to<br />
conform IS 814 all positions. Contractor has to ma<strong>in</strong>ta<strong>in</strong> the<br />
quality records <strong>in</strong> respect of moisture content and bak<strong>in</strong>g of<br />
electrodes on a daily basis and should deploy sufficient<br />
number of portable ovens to ensure electrodes are not let<br />
open after bak<strong>in</strong>g<br />
iii) All accessories required for undertak<strong>in</strong>g the task such as<br />
weld<strong>in</strong>g equipments, gr<strong>in</strong>d<strong>in</strong>g mach<strong>in</strong>es, chipp<strong>in</strong>g, bevel<strong>in</strong>g<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />
54/127