xiii)<br />

the User Manager and MYCR<br />

Firm to provide performance guarantee from OEM for pa<strong>in</strong>t<br />

scheme<br />

(D)<br />

CONTRACTOR’S LIABILITY<br />

WELDER QUALIFICATION:­<br />

Sl Activity Confirm ability to<br />

meet requirement<br />

(Answer <strong>in</strong> Yes/No)<br />

i) The firm should have qualified welders certified by IRS or<br />

any other weld<strong>in</strong>g society to adhere with Naval structural<br />

standards NES/DGS weld<strong>in</strong>g booklet and should submit<br />

their experience & qualification certificate for tradesmen and<br />

welder, performance qualification (WPQ) certificate to the<br />

<strong>in</strong>spection authority. These welders are required to be<br />

qualified <strong>in</strong> all positions for weld<strong>in</strong>g.<br />

ii) Survey and quality <strong>in</strong>spection for the work be<strong>in</strong>g undertaken<br />

is to be done by MFAB/ MQC(Hull). F<strong>in</strong>al <strong>in</strong>spection after<br />

assembly at the site is to be undertaken both by <strong>dockyard</strong><br />

QC .<br />

iii) Prior to commencement of work, firm has to submit follow<strong>in</strong>g<br />

documents:­<br />

(a) QAP for undertak<strong>in</strong>g the job. The extent of NDT is to be<br />

<strong>in</strong>cluded <strong>in</strong> the QA / QC plan.<br />

(b) Welder qualification duly certified by IRS / LRS.<br />

(c) Work can commence on approval of QAP and<br />

acceptance of Welder qualifications and NDT norms by ND<br />

(MB). Delay <strong>in</strong> approval of QAP will be attributable to<br />

Contractor.<br />

(E)<br />

OTHER LIABILITIES<br />

Sl Activity Confirm ability to<br />

adhere to<br />

requirement<br />

(Answer <strong>in</strong> Yes/No)<br />

i) Supply of all types of pa<strong>in</strong>ts as specified <strong>in</strong> the SOW<br />

ii) Gas cutt<strong>in</strong>g /weld<strong>in</strong>g equipment & materials/ Electrodes to<br />

conform IS 814 all positions. Contractor has to ma<strong>in</strong>ta<strong>in</strong> the<br />

quality records <strong>in</strong> respect of moisture content and bak<strong>in</strong>g of<br />

electrodes on a daily basis and should deploy sufficient<br />

number of portable ovens to ensure electrodes are not let<br />

open after bak<strong>in</strong>g<br />

iii) All accessories required for undertak<strong>in</strong>g the task such as<br />

weld<strong>in</strong>g equipments, gr<strong>in</strong>d<strong>in</strong>g mach<strong>in</strong>es, chipp<strong>in</strong>g, bevel<strong>in</strong>g<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420<br />