10 kg/cm2. Total Qty 35 mtr<br />
(n) 12 <strong>in</strong> nos. S/W system Cu Ni p0ipes/ 32 dia / 4.5<br />
Kg / Cm2. Total Qty10 mtr<br />
(p) 22 <strong>in</strong> nos. Air system MS pipes/ 20/10.5kg/cm2.<br />
Total Qty 30 mtr<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 15 OF22<br />
Activity Description Remove the Pipes (328 Nos.<br />
) from their location prior permission of ss. Manually<br />
clean the pipes, subsequently chemical clean<strong>in</strong>g.<br />
Post chemical clean<strong>in</strong>g the pipes to be offered for<br />
open<strong>in</strong>g <strong>in</strong>spection. On recommendation of QC rep<br />
the pipes to be repaired by us<strong>in</strong>g orig<strong>in</strong>al l<strong>in</strong>e<br />
material. S/W system and Fire ma<strong>in</strong> system pipes<br />
must be repaired/ renewed by MS (hot dip<br />
galvanized) pipes. Pipes to be hydro pressure<br />
tested at 1.5 times of work<strong>in</strong>g pressure of the<br />
system. Post pressure test<strong>in</strong>g all pipes to be<br />
pa<strong>in</strong>ted by oil pa<strong>in</strong>t as per systems color code.<br />
Pipes to be fitted back <strong>in</strong> place by us<strong>in</strong>g new<br />
Gaskets and Fasteners. Secure the pipes. The<br />
system to be Leak tested.<br />
E20029 Defect Description<br />
The follow<strong>in</strong>g Water valves to be removed,<br />
Overhauled, Pressure tested and fitted back.{size<br />
(In mm)/Test Pr (<strong>in</strong> Kg/Cm2).} MaterialGun Metal.<br />
(a) Both ma<strong>in</strong> sea suction SDNR valve 80/ 3.5<br />
kg/cm2 Qty 02<br />
(b) Both ma<strong>in</strong> sea suction SDSL valve 80/ 3.5<br />
kg/cm2 Qty 02<br />
(c) Both sea chest air release SD valve 40/ 3.5<br />
kg/cm2 Qty 02<br />
(d) Both sea chest weed clean<strong>in</strong>g Air Valve 20/ 10.5<br />
kg/cm2 Qty 02<br />
(e) Both M/E S/W pump suction (N/R) Valve 50/ 3.5<br />
1 3 3<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 98/127