- Page 1 and 2: Tele: 0222275 2066 Fax: 022
- Page 3 and 4: 12. Earnest Money Deposit. The bidd
- Page 5 and 6: 18. (a) The Commercial bid is to be
- Page 7: ARTICLE 11 QUALITY AND INSPECTIO
- Page 11 and 12: p q Similar jobs in marine field
- Page 13 and 14: DYT/INCOD/1213/106(a)/PLYCM/MAD
- Page 15 and 16: fender securing brackets Supply Sup
- Page 17 and 18: store corroded/broken. To be renewe
- Page 19 and 20: enewed. Size - 3ft 6 in x 3 ft (a)0
- Page 21 and 22: structure on 01 deck broken / peris
- Page 23 and 24: To be replaced with four double bun
- Page 25 and 26: painted with craft name. 08 in nos
- Page 27 and 28: Surface preparation by hydro blasti
- Page 29 and 30: (a) M/s Sigma paint scheme (i) To b
- Page 31 and 32: (iv) Intershield 300(bronze) - 150
- Page 33 and 34: H10069 General Surfaces in Dry Co
- Page 35 and 36: (ii) Pilot Primer, Gery to achieve
- Page 37 and 38: (ii) Withdraw shaft and check truen
- Page 39 and 40: E20014 Overhauling (3000 Hourly r
- Page 41 and 42: (g). Fuel filling system MS pipes/
- Page 43 and 44: (q) Both M/E F/W cooler drain valve
- Page 45 and 46: (viii) Seal oil Part Nos 509.0.10.1
- Page 47 and 48: overhauled and tested onboard, (e)
- Page 49 and 50: (b) control panel defective to be o
- Page 51 and 52: (e) (f) Total VAT @______% (if appl
- Page 53 and 54: epair of ships or boats or vessels
- Page 55 and 56: machine, measuring instruments, Oxy
- Page 57 and 58: NAVAL DOCKYARD MUMBAI DOC CODE Q C
- Page 59 and 60:
suitable for DP Test approved equiv
- Page 61 and 62:
25 Fairleads,Ventilation trunking e
- Page 63 and 64:
followed 37 Provision of material t
- Page 65 and 66:
DYT/INCOD/1213/106(a)/PLYCM/MAD
- Page 67 and 68:
NAVAL DOCKYARD, MUMBAI TITLE : QUAL
- Page 69 and 70:
i) Check for meters serviceability,
- Page 71 and 72:
efurbishment, new installation and
- Page 73 and 74:
11 Repair, Overhauling, refurbishme
- Page 75 and 76:
of Wall mounted fan 16 Overhauling,
- Page 77 and 78:
commissioning / testing of Oily wat
- Page 79 and 80:
25 Carbon brushes, brush holder, Ro
- Page 81 and 82:
SCOPE OF WORK P R W H vi) Check for
- Page 83 and 84:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 85 and 86:
E20006 Defect Description If clea
- Page 87 and 88:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 89 and 90:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 91 and 92:
pump post Overhauling. Make FloRi
- Page 93 and 94:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 95 and 96:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 97 and 98:
DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 99 and 100:
kg/cm2 Qty 02 (f) Both M/E S/W suct
- Page 101 and 102:
65 mm, Mat Steel, TP 3.0 kg/cm2
- Page 103 and 104:
new flanges. Hot bending is not per
- Page 105 and 106:
Activity Description Remove the cou
- Page 107 and 108:
ARTICLE 14 INDEMNITY & INSURANCE
- Page 109 and 110:
ARTICLE 2 EFFECTIVE DATE AND OPE
- Page 111 and 112:
5.2 “END USER” CERTIFICATE. Con
- Page 113 and 114:
Certificate (applicable in the case
- Page 115 and 116:
ARTICLE 14 INDEMNITY & INSURANCE
- Page 117 and 118:
procuring the Contracts or forbeari
- Page 119 and 120:
(c) Control generation and disposal
- Page 121 and 122:
ANNEX 2 to Encl - III to RFP SCOP
- Page 123 and 124:
DESIGNATION / RANK DEPT/ORGANISATIO
- Page 125 and 126:
‘T’ BID COMPLIANCE MATRIX (TO B
- Page 127:
Enclosure VII of RFP EMD Bank Guara