COSTING / QUOTATION<br />
7 Enclosure VII of RFP : EMD Bank Guarantee format<br />
SCHEDULE OF REQUIREMENTS (SOR)<br />
Enclosure II of RFP<br />
(Note: The Schedule of Requirements is a tech<strong>nic</strong>al document and specific<br />
to the Project/ Service and is part of the RFP)<br />
Annexure 1 Particulars of Vessel/Asset on which work is required to be carried out.<br />
Annexure 2 Quantified Work Package (comprehensive scope of work that conta<strong>in</strong>s breakup<br />
of <strong>in</strong>dividual jobs to be completed <strong>in</strong>clud<strong>in</strong>g survey, dismantl<strong>in</strong>g and <strong>in</strong>spection, rout<strong>in</strong>es<br />
and repair to be carried out, consequent repair, trials and comprehensive list of services<br />
required such as dry dock<strong>in</strong>g, berth<strong>in</strong>g, jetty services (electricity, accommodation, phone,<br />
fresh water, fire ma<strong>in</strong>), cranes facilities, tugs and pilot charges.<br />
Annexure 3 Quality Inspection Schedules/QAP (m<strong>in</strong>imum and essential parameters that are<br />
required to be achieved for the scope of work to be deemed as satisfactorily completed).<br />
Note : Vendor should prepare a work<strong>in</strong>g level QAP based on actual SOW and<br />
submit to MQC for approval with<strong>in</strong> 10 days of placement of order.<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />