COSTING / QUOTATION<br />

7 Enclosure VII of RFP : EMD Bank Guarantee format<br />

SCHEDULE OF REQUIREMENTS (SOR)<br />

Enclosure II of RFP<br />

(Note: The Schedule of Requirements is a tech<strong>nic</strong>al document and specific<br />

to the Project/ Service and is part of the RFP)<br />

Annexure 1 ­ Particulars of Vessel/Asset on which work is required to be carried out.<br />

Annexure 2 ­ Quantified Work Package (comprehensive scope of work that conta<strong>in</strong>s breakup<br />

of <strong>in</strong>dividual jobs to be completed <strong>in</strong>clud<strong>in</strong>g survey, dismantl<strong>in</strong>g and <strong>in</strong>spection, rout<strong>in</strong>es<br />

and repair to be carried out, consequent repair, trials and comprehensive list of services<br />

required such as dry dock<strong>in</strong>g, berth<strong>in</strong>g, jetty services (electricity, accommodation, phone,<br />

fresh water, fire ma<strong>in</strong>), cranes facilities, tugs and pilot charges.<br />

Annexure 3 ­ Quality Inspection Schedules/QAP (m<strong>in</strong>imum and essential parameters that are<br />

required to be achieved for the scope of work to be deemed as satisfactorily completed).<br />

Note :­ Vendor should prepare a work<strong>in</strong>g level QAP based on actual SOW and<br />

submit to MQC for approval with<strong>in</strong> 10 days of placement of order.<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420<br />