06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DEPT: QC(E) C. No<br />

74<br />

SHIP: FC MADHUR<br />

REV<br />

No:0<br />

1<br />

NAVAL DOCKYARD, MUMBAI<br />

QUALITY ASSURANCE PLAN<br />

DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />

NO<br />

JOB TITLE :REFIT<br />

QAP No : QCE74 ­245 QAP DATE : 11­JUL­12 PAGE 4 OF 22<br />

E­<br />

20007<br />

Defect Description<br />

Carry out renewal of ‘A’ Bracket thorden bushes with<br />

carrier shaft and sight<strong>in</strong>g, correction analyze of eccentricity and evaluate if any. the shaft Renewal sight<strong>in</strong>g of<br />

bushes read<strong>in</strong>gs, and mach<strong>in</strong>e mach<strong>in</strong><strong>in</strong>g the <strong>in</strong>struction bushes as per as the per sight<strong>in</strong>g, <strong>in</strong>spection<br />

report check and the recommendation butt clearance of of the MQCE. bushes after fitment <strong>in</strong><br />

02<br />

Activity the hous<strong>in</strong>g, Description check the load l<strong>in</strong>e of the shaft, check<br />

Measure the compression the clearances of the of Marna the A gland bracket , check bushes the oil and<br />

rectify leakage after the sight<strong>in</strong>g read<strong>in</strong>g. Renew the bear<strong>in</strong>g<br />

with (iii) it’s check carrier the if plummer required block bear<strong>in</strong>g with its fitt<strong>in</strong>gs,<br />

visual and dimensional <strong>in</strong>spection of bear<strong>in</strong>gs, renew<br />

the damaged bear<strong>in</strong>gs, check the bear<strong>in</strong>g clearances,<br />

check the plummer block load<strong>in</strong>g.<br />

(iv) Replace the bulkhead gland and <strong>in</strong>sert the hemp<br />

pack<strong>in</strong>g ensur<strong>in</strong>g the clearances between shaft and<br />

Bulkhead.<br />

(v) Check the impression of the coupl<strong>in</strong>g hub, key<br />

with respect to shaft and check the nut<br />

1 ­ 3 3<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 86/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!