stiffeners etc and plate<br />

breached with supports<br />

around the periphery with<br />

moon plate etc to prevent<br />

deformation due to full<br />

weld<strong>in</strong>g.<br />

NES 155 or<br />

approved<br />

equivalent<br />

standards<br />

thick etc are as per<br />

weld jo<strong>in</strong>t standard.<br />

NAVAL DOCKYARD MUMBAI<br />

DOC CODE Q C H 7 4 Q A P 0 3 8<br />

DEPT : MQC ( HULL) C NO 74 ISSUE<br />

NO 02<br />

DATE : 22 APR 09 PAGE 3 OF 9<br />

7<br />

8<br />

9<br />

10<br />

Plate fit­up <strong>in</strong>spection i.e.<br />

tack welded all around<br />

with longitud<strong>in</strong>al, frames,<br />

stiffeners etc and plate<br />

breached with supports<br />

around the periphery with<br />

moon plate etc to prevent<br />

deformation due to full<br />

weld<strong>in</strong>g.<br />

Weld the plate with<br />

stiffeners from <strong>in</strong>ner side<br />

strictly <strong>in</strong> sequence.<br />

Back gaug<strong>in</strong>g and<br />

gr<strong>in</strong>d<strong>in</strong>g, 1 st DP test for to<br />

rectify the defects prior to<br />

offer the DP to QC(H)<br />

Inspection of back gauge<br />

and DP Test prior to full<br />

weld from outside,<br />

through clean post<br />

<strong>in</strong>spection<br />

(a) Full weld from outer<br />

side with breches<br />

11<br />

(b) Rectify deformation<br />

beyond tolerances<br />

12 Remove / cutt<strong>in</strong>g and<br />

gr<strong>in</strong>d<strong>in</strong>g of moon plates,<br />

keys etc and prepare the<br />

weld bid or re<strong>in</strong>forcement<br />

Standard ship<br />

repair<strong>in</strong>g<br />

practices as per<br />

NES 155 or<br />

approved<br />

equivalent<br />

standards<br />

PCW’s sequence<br />

of weld<strong>in</strong>g for<br />

plat<strong>in</strong>g Page 343<br />

Standard ship<br />

repair<strong>in</strong>g<br />

practices as per<br />

NES 155 or<br />

approved<br />

equivalent<br />

standards<br />

Standard ship<br />

repair<strong>in</strong>g<br />

practices as per<br />

NES 155 or<br />

approved<br />

equivalent<br />

standards<br />

Standard ship<br />

repair<strong>in</strong>g<br />

practices as per<br />

NES 155 or<br />

1/<br />

2<br />

1/<br />

2<br />

1/<br />

2<br />

1/<br />

2<br />

1/<br />

2<br />

1/<br />

2<br />

3<br />

3<br />

Check mis­match, root<br />

gap, weld edge,<br />

chamfer<strong>in</strong>g for different<br />

thick etc are as per<br />

weld jo<strong>in</strong>t standard.<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 58/127