naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
commission<strong>in</strong>g /<br />
test<strong>in</strong>g of Oily water<br />
separator & Fire<br />
monitor<strong>in</strong>g System &<br />
Flood Alarm System<br />
RO plant system &<br />
STP System<br />
22 Repair, refurbishment,<br />
new <strong>in</strong>stallation and<br />
commission<strong>in</strong>g of<br />
switch gears <strong>in</strong> the<br />
system panel /<br />
starter/switch board &<br />
Auto/hand Change<br />
Over switch /<br />
Switches/ Indications /<br />
relays/contactor /<br />
Pressure switch/ level<br />
switches /temp<br />
sensor/ sensors /<br />
Solenoid Valve, cutout<br />
& Thermostat/ flood<br />
/float switches/sensor<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />
the QC check prior to fitment. vii) Measur<strong>in</strong>g<br />
<strong>in</strong>struments to be calibrated viii) Check for<br />
Operational performance of System & full load trials<br />
on board. ixi) Check for system operation as per<br />
SOW & Tech manual ix) Check for fitment &<br />
operational test x) Test certificate to be provided if<br />
any<br />
Refer to QAP : QCL074QAP059 for control panels<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />
the QC check prior to fitment. vii) Measur<strong>in</strong>g <strong>in</strong>struments<br />
to be calibrated viii) Check for Operational performance &<br />
full load trials on board as per SOW & Tech manual ix)<br />
Test certificate to be provided if any x) Panel to be<br />
pa<strong>in</strong>ted as per navy Grade.<br />
1 2&3 3 3<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 11 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
23 Cable/wire, cabl<strong>in</strong>g &<br />
Bus bar , bus bar<br />
i) QCL074QAP023 for Cabl<strong>in</strong>g .<br />
(ii) Check for open<strong>in</strong>g <strong>in</strong>spection for cabl<strong>in</strong>g for<br />
1 2&3 3 3<br />
fitment, External condition of system / <strong>in</strong>ternal wir<strong>in</strong>g. If perished wir<strong>in</strong>g<br />
/Internal wir<strong>in</strong>g found to be renewed, . if one / two cables/ wires<br />
found perished/ burnt. Then only perished wir<strong>in</strong>g to<br />
be renewed.<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 77/127