mach<strong>in</strong>e, measur<strong>in</strong>g <strong>in</strong>struments,<br />
Oxygen,Actylene,Argon,Co2 etc are to be catered by the<br />
contractor.<br />
iv) Seamless steel pipes for steel bollards to conform IS<br />
4373/80<br />
v) Steel plates / frames not mentioned as Dockyard liability to<br />
conform IS 2062 GR – B<br />
vi) Degutt<strong>in</strong>g and regutt<strong>in</strong>g <strong>in</strong> way of repair work/steel renewal<br />
work and any damage dur<strong>in</strong>g degutt<strong>in</strong>g/ regutt<strong>in</strong>g<br />
vii) Scaffold<strong>in</strong>g/ stag<strong>in</strong>g, safety gears & equipments, fire<br />
ext<strong>in</strong>guishers with sentry<br />
viii) Any <strong>in</strong>cidental job/any other item which is not separately<br />
mentioned <strong>in</strong> the SOW and is required for the full and<br />
satisfactory completion of the work will be provided by the<br />
Contractor.<br />
ix) Clean<strong>in</strong>g and removal of scrap generated dur<strong>in</strong>g repairs from<br />
DD/Yard/On board craft to the place <strong>in</strong>dicated by the Yard<br />
authorities.<br />
x) If any specification of material / spare is not given <strong>in</strong> the<br />
SOW, it will be as per sample or as per QC<br />
directive/approval and Contractor will adhere to such<br />
directive.<br />
xi) Transportation of all materials, provision of any other item<br />
which is not specifically mentioned<br />
xii) The firm has to submit a time bound PERT Chart prior to<br />
commencement of refit<br />
xiii) Any damages or loss to the yard material / equipment /<br />
property to be made good at the contractor’s cost and risk<br />
xiv) Bank Guarantee, Indemnity Bond and Transit Insurance to<br />
be undertaken by subcontractor for ND (MB) material as per<br />
commercial terms<br />
xv) Safety gear i.e. personal protective equipment for workmen<br />
employed is to be provided by the contractor. Insurance for<br />
the employees work<strong>in</strong>g at the Naval Dockyard would be the<br />
responsibility of the contractor<br />
xvi) Contractor has to arrange Temporary light<strong>in</strong>g as and when<br />
required.<br />
xvii) Dur<strong>in</strong>g contractual period, if the contractor is unable to meet<br />
the production targets required by ND (MB) or if quality of<br />
work is substandard. ND (MB) will reserve the right to cancel<br />
the contract without any f<strong>in</strong>ancial implications to ND (MB).<br />
xviii) The work is to be carried out by the contractor utiliz<strong>in</strong>g their<br />
own manpower and <strong>in</strong>frastructure with<strong>in</strong> ND(MB) premises<br />
and further subcontract<strong>in</strong>g of the work to another agency is<br />
not permitted<br />
xix) In case of any addition / alteration required dur<strong>in</strong>g progress<br />
of work, User Manager's recommendation would be b<strong>in</strong>d<strong>in</strong>g<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />
55/127