mach<strong>in</strong>e, measur<strong>in</strong>g <strong>in</strong>struments,<br />

Oxygen,Actylene,Argon,Co2 etc are to be catered by the<br />

contractor.<br />

iv) Seamless steel pipes for steel bollards to conform IS<br />

4373/80<br />

v) Steel plates / frames not mentioned as Dockyard liability to<br />

conform IS ­2062 GR – B<br />

vi) Degutt<strong>in</strong>g and re­gutt<strong>in</strong>g <strong>in</strong> way of repair work/steel renewal<br />

work and any damage dur<strong>in</strong>g de­gutt<strong>in</strong>g/ re­gutt<strong>in</strong>g<br />

vii) Scaffold<strong>in</strong>g/ stag<strong>in</strong>g, safety gears & equipments, fire<br />

ext<strong>in</strong>guishers with sentry<br />

viii) Any <strong>in</strong>cidental job/any other item which is not separately<br />

mentioned <strong>in</strong> the SOW and is required for the full and<br />

satisfactory completion of the work will be provided by the<br />

Contractor.<br />

ix) Clean<strong>in</strong>g and removal of scrap generated dur<strong>in</strong>g repairs from<br />

DD/Yard/On board craft to the place <strong>in</strong>dicated by the Yard<br />

authorities.<br />

x) If any specification of material / spare is not given <strong>in</strong> the<br />

SOW, it will be as per sample or as per QC<br />

directive/approval and Contractor will adhere to such<br />

directive.<br />

xi) Transportation of all materials, provision of any other item<br />

which is not specifically mentioned<br />

xii) The firm has to submit a time bound PERT Chart prior to<br />

commencement of refit<br />

xiii) Any damages or loss to the yard material / equipment /<br />

property to be made good at the contractor’s cost and risk<br />

xiv) Bank Guarantee, Indemnity Bond and Transit Insurance to<br />

be undertaken by subcontractor for ND (MB) material as per<br />

commercial terms<br />

xv) Safety gear i.e. personal protective equipment for workmen<br />

employed is to be provided by the contractor. Insurance for<br />

the employees work<strong>in</strong>g at the Naval Dockyard would be the<br />

responsibility of the contractor<br />

xvi) Contractor has to arrange Temporary light<strong>in</strong>g as and when<br />

required.<br />

xvii) Dur<strong>in</strong>g contractual period, if the contractor is unable to meet<br />

the production targets required by ND (MB) or if quality of<br />

work is substandard. ND (MB) will reserve the right to cancel<br />

the contract without any f<strong>in</strong>ancial implications to ND (MB).<br />

xviii) The work is to be carried out by the contractor utiliz<strong>in</strong>g their<br />

own manpower and <strong>in</strong>frastructure with<strong>in</strong> ND(MB) premises<br />

and further subcontract<strong>in</strong>g of the work to another agency is<br />

not permitted<br />

xix) In case of any addition / alteration required dur<strong>in</strong>g progress<br />

of work, User Manager's recommendation would be b<strong>in</strong>d<strong>in</strong>g<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420<br />