06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of Wall mounted fan<br />

16 Overhaul<strong>in</strong>g,<br />

refurbishment, new<br />

<strong>in</strong>stallation and<br />

commission<strong>in</strong>g /<br />

test<strong>in</strong>g of Lead Acid<br />

batteries / Dry Cell<br />

batteries /No<br />

ma<strong>in</strong>tenance batteries<br />

17 Renewal /new<br />

<strong>in</strong>stallation and /<br />

test<strong>in</strong>g of Socket /<br />

Switches / Extension<br />

board /Indication<br />

lamps type<br />

per sample / OEM make/ reputed make. iv) Check for<br />

fitment, connection, secure & tightness. New material bill<br />

to be submitted v) If item /equipment found beyond<br />

repair to be renewed as per sample/make/ OEM<br />

make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />

the QC check prior to fitment. vii) Check for Operational<br />

performance & full load trials on board. Vii) Check for<br />

new wall mounted fan Make/sweep/rat<strong>in</strong>g etc. as per<br />

SOW ii) Check for fitment & operational test.<br />

i) Visual checks for any defects for serviceability.<br />

ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />

iii) To be renewed as per sample / OEM make/ reputed<br />

make. iv) Check for fitment, connection, secure &<br />

tightness. New material bill to be submitted vi) Batteries<br />

to be offered the QC check prior to fitment. vii) Check for<br />

Operational and commission<strong>in</strong>g of batteries viii) Batteries<br />

to be tested two times for charg<strong>in</strong>g & discharg<strong>in</strong>g on full<br />

load. Acid density to be checked.<br />

Refer to QAP : QCL074QAP059<br />

i) Visual checks for any defects for serviceability.<br />

ii) Check for clean<strong>in</strong>g / renewal. iv) Check for fitment,<br />

connection, secure & tightness. New material bill to be<br />

submitted v) If item /equipment found beyond repair to<br />

be renewed as per sample/make/ OEM make/rat<strong>in</strong>g. vi)<br />

1 2&3 3 3<br />

1 2&3 3 3<br />

NAVAL DOCKYARD, MUMBAI<br />

TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />

DEPT. :<br />

QC(ELECTRICAL )<br />

C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 09 OF 14<br />

Sr. ACTIVITY<br />

No. DESCRIPTION<br />

REFERENCE DOCMENT & CHECK LIST INSPECTION<br />

SCOPE OF WORK P R W H<br />

New material compartment to be offered the QC<br />

check prior to fitment. vii) Check for Operational<br />

performance & full load trials on board. Vii) Check<br />

for new multip<strong>in</strong> switch socket make/ capacity ii)<br />

Check for test as per SOW<br />

18 Overhaul<strong>in</strong>g,<br />

Refer to QAP : QCL074QAP059<br />

1 2&3 3 3<br />

refurbishment, new i) Visual checks for any defects for serviceability.<br />

<strong>in</strong>stallation and ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g /<br />

commission<strong>in</strong>g / test<strong>in</strong>g renewal. iii) Check defective /miss<strong>in</strong>g competent to be<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 75/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!