of Wall mounted fan<br />
16 Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
commission<strong>in</strong>g /<br />
test<strong>in</strong>g of Lead Acid<br />
batteries / Dry Cell<br />
batteries /No<br />
ma<strong>in</strong>tenance batteries<br />
17 Renewal /new<br />
<strong>in</strong>stallation and /<br />
test<strong>in</strong>g of Socket /<br />
Switches / Extension<br />
board /Indication<br />
lamps type<br />
per sample / OEM make/ reputed make. iv) Check for<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />
the QC check prior to fitment. vii) Check for Operational<br />
performance & full load trials on board. Vii) Check for<br />
new wall mounted fan Make/sweep/rat<strong>in</strong>g etc. as per<br />
SOW ii) Check for fitment & operational test.<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) To be renewed as per sample / OEM make/ reputed<br />
make. iv) Check for fitment, connection, secure &<br />
tightness. New material bill to be submitted vi) Batteries<br />
to be offered the QC check prior to fitment. vii) Check for<br />
Operational and commission<strong>in</strong>g of batteries viii) Batteries<br />
to be tested two times for charg<strong>in</strong>g & discharg<strong>in</strong>g on full<br />
load. Acid density to be checked.<br />
Refer to QAP : QCL074QAP059<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for clean<strong>in</strong>g / renewal. iv) Check for fitment,<br />
connection, secure & tightness. New material bill to be<br />
submitted v) If item /equipment found beyond repair to<br />
be renewed as per sample/make/ OEM make/rat<strong>in</strong>g. vi)<br />
1 2&3 3 3<br />
1 2&3 3 3<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 09 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
New material compartment to be offered the QC<br />
check prior to fitment. vii) Check for Operational<br />
performance & full load trials on board. Vii) Check<br />
for new multip<strong>in</strong> switch socket make/ capacity ii)<br />
Check for test as per SOW<br />
18 Overhaul<strong>in</strong>g,<br />
Refer to QAP : QCL074QAP059<br />
1 2&3 3 3<br />
refurbishment, new i) Visual checks for any defects for serviceability.<br />
<strong>in</strong>stallation and ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g /<br />
commission<strong>in</strong>g / test<strong>in</strong>g renewal. iii) Check defective /miss<strong>in</strong>g competent to be<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 75/127