(k) Both M/E F/W dra<strong>in</strong> valve 25/4.5 kg/cm2 Qty 02<br />
(l) Both M/E F/W cooler dra<strong>in</strong> valve 25/ 4.5 kg/cm2<br />
Qty 02<br />
(m) G.S pump valve chest (01 nos x 06 valves on<br />
chest)50/4.5 kg/cm2 Qty 01 set<br />
(n) Bilge pump valve chest (02 No's x 03 valves on<br />
each)50/ 4.5 kg/cm2 Qty 02 set<br />
(p) Fire hydrant valve 32/ 07 kg/cm2 Qty 04<br />
Activity Description Remove the Valves (29 Nos.)<br />
from their location prior permission of ss. Procure<br />
the valves from the manufacturer as per material,<br />
type and size. Submit the purchase receipt and Mill<br />
certificate to QC. All valves to be pressure tested <strong>in</strong><br />
front of QC rep. All the old Valves are to be handed<br />
over to the ship’s staff / customer<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 21 OF22<br />
E20034 Defect Description<br />
Renewal of 02 <strong>in</strong> nos submersible pump (with<br />
starter) make Modi Capacity 20 TPH. Qty 02<br />
1 3 3<br />
Activity Description<br />
Remove both old pumps and replace them with new<br />
ones. Firm to submit the manufacturer certificate<br />
E20036 All types of fill<strong>in</strong>g pipes from upper deck to E/R<br />
renewal/ repaired.<br />
Activity Description Renew/ repair the pipes as<br />
per material /size. Pressure test<strong>in</strong>g to be witnessed<br />
by QC rep<br />
E20038 Defect Description<br />
STBD GS pump coupl<strong>in</strong>g to be repaired<br />
1 3 3<br />
1 3 3<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 104/127