naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Search light fitt<strong>in</strong>gs/<br />
Halogen light fitt<strong>in</strong>gs/<br />
Flood light fitt<strong>in</strong>gs/<br />
Dom light fitt<strong>in</strong>gs /<br />
Navigation light fitt<strong>in</strong>gs/<br />
Fluorescent tube light<br />
fitt<strong>in</strong>gs,/ Emergency<br />
light fitt<strong>in</strong>gs,<br />
Ceremonial & Weather<br />
deck light fitt<strong>in</strong>gs,<br />
Table lights<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />
the QC check prior to fitment. vii) Check for Operational<br />
performance & full load trials on board. viii) Light<br />
fitt<strong>in</strong>gs to be pa<strong>in</strong>ted as per Navy grade.<br />
iii) Check for fitment & connection of switch socket<br />
connection tightness secur<strong>in</strong>g. iv) Check for operation of<br />
fitt<strong>in</strong>gs & switch socket as per QAP.<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 08 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
14 Repair, Overhaul<strong>in</strong>g, Refer to QAP : QCL074QAP059 for control panels. 1 2&3 3 3<br />
refurbishment, new i) Visual checks for any defects for serviceability.<br />
<strong>in</strong>stallation and test<strong>in</strong>g ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
of Navigational light iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
control panel.<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g. vi) New material compartment to be offered<br />
the QC check prior to fitment. vii) Check for Operational<br />
performance & full load trials on board. viii) Panel box<br />
to be pa<strong>in</strong>ted as per Navy grade.<br />
15 Repair, Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and test<strong>in</strong>g<br />
Refer to QAP : QCL074QAP059<br />
i) Visual checks for any defects for serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
1 2&3 3 3<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 74/127