naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NAVAL DOCKYARD MUMBAI<br />
DOC CODE Q C H 7 4 Q A P 0 3 8<br />
DEPT : MQC ( HULL) C NO 74 ISSUE<br />
NO 02<br />
DATE : 22 APR 09 PAGE 2 OF 9<br />
4 Prior commencement of<br />
weld<strong>in</strong>g, The yard/<br />
Contractor must posses<br />
(a) WPS & PQR (b) As<br />
per WPS & PQR valid<br />
certificate for welders with<br />
their <strong>in</strong>dividual identity<br />
w.r.t certification while<br />
work<strong>in</strong>g (c) Proper<br />
weld<strong>in</strong>g equipments (d)<br />
Proper bak<strong>in</strong>g oven and<br />
hand oven (e) Correct<br />
consumable and process<br />
prescribed for the job.<br />
Ensure all the terms<br />
before f<strong>in</strong>alise the<br />
contract.<br />
5 Weld edge preparation /<br />
fair<strong>in</strong>g and gr<strong>in</strong>d<strong>in</strong>g of the<br />
area. Frames and<br />
longitud<strong>in</strong>al to be<br />
assessed / renewed,<br />
where ever possible<br />
template or mould to be<br />
prepared to manufacture<br />
new plate for renewal<br />
New plate to be prepared<br />
accord<strong>in</strong>g to the template<br />
or mould and prepare<br />
weld edge prior to lift the<br />
6<br />
plate & ensure plates and<br />
sections are detect free<br />
and SA2.5 blasted and<br />
primed.<br />
7 Plate fitup <strong>in</strong>spection i.e.<br />
tack welded all around<br />
with longitud<strong>in</strong>al, frames,<br />
Standard ship<br />
repair<strong>in</strong>g<br />
practices as per<br />
NES 155 or<br />
approved<br />
equivalent<br />
standards<br />
Standard ship<br />
repair<strong>in</strong>g<br />
practices as per<br />
NES 155 or<br />
approved<br />
equivalent<br />
standards<br />
Standard ship<br />
repair<strong>in</strong>g<br />
practices as per<br />
NES 155 or<br />
approved<br />
equivalent<br />
standards<br />
Standard ship<br />
repair<strong>in</strong>g<br />
practices as per<br />
1/<br />
2<br />
1/<br />
2<br />
1/<br />
2<br />
1/<br />
2<br />
3<br />
3 Check mismatch, root<br />
gap, weld edge,<br />
chamfer<strong>in</strong>g for different<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 57/127