SCOPE OF WORK P R W H<br />

vi) Check for identification tallies. Tallies should be<br />

suitable, visible, durable, reliable, identified & tally<br />

material should be durable, quality material. Like for<br />

example alum<strong>in</strong>um metal/PVC engraved tally. vii)<br />

Check for Identification tallies for panel <strong>in</strong>ternal and<br />

external as per draw<strong>in</strong>g/ requirement/OEM specified.<br />

viii) Check for numbers / ferrules of wir<strong>in</strong>g end<br />

term<strong>in</strong>al as per circuit diagrams. It should be visible,<br />

proper size, quality material, suitable and durable.<br />

ix) Check for sleeve over cable jo<strong>in</strong>ts, at cable<br />

term<strong>in</strong>al ends, For over Cable jo<strong>in</strong>ts/ Cable end<br />

term<strong>in</strong>al /over lugs heat shr<strong>in</strong>k sleeve / PVC sleeve to<br />

be used. Confirm<strong>in</strong>g IS Standard only.<br />

Remarks : (A) For QC clearance Repair, refurbishment / <strong>in</strong>stallation / fitment &<br />

test<strong>in</strong>g /commission<strong>in</strong>g of Electrical DL’s on the ship /craft/boat<br />

(B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold<br />

(ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS<br />

© (i) CHP (Customer Hold po<strong>in</strong>t ) The contactor is not to proceed further till approval of QC<br />

Supervisor<br />

(ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out,<br />

Gauges & measur<strong>in</strong>g <strong>in</strong>struments to be submitted. If requirement of re­calibration, To be<br />

carried from approved Govt lab.<br />

(iii) Test certificates of material / spares from OEM make / Government approved lab to<br />

be<br />

provided / submitted. New material used dur<strong>in</strong>g overhaul<strong>in</strong>g / New <strong>in</strong>stallation<br />

of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered <strong>in</strong><br />

stage wise / <strong>in</strong> process <strong>in</strong>spection that are Removal, Open<strong>in</strong>g, overhaul<strong>in</strong>g,<br />

Installation and load trials & commission<strong>in</strong>g for QC checks. If HAT & SAT trials<br />

reports and Ship issued WDC to be submitted for preparation for <strong>in</strong>spection Note.<br />

(v) Additional QC checks may be undertaken <strong>in</strong> case of repeated failure.<br />

DEPT: QC(E) C. No<br />

74<br />

SHIP: FC MADHUR<br />

NAVAL DOCKYARD, MUMBAI<br />

QUALITY ASSURANCE PLAN<br />

REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />

No:01<br />

NO<br />

JOB TITLE : REFIT<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 81/127