SCOPE OF WORK P R W H<br />
vi) Check for identification tallies. Tallies should be<br />
suitable, visible, durable, reliable, identified & tally<br />
material should be durable, quality material. Like for<br />
example alum<strong>in</strong>um metal/PVC engraved tally. vii)<br />
Check for Identification tallies for panel <strong>in</strong>ternal and<br />
external as per draw<strong>in</strong>g/ requirement/OEM specified.<br />
viii) Check for numbers / ferrules of wir<strong>in</strong>g end<br />
term<strong>in</strong>al as per circuit diagrams. It should be visible,<br />
proper size, quality material, suitable and durable.<br />
ix) Check for sleeve over cable jo<strong>in</strong>ts, at cable<br />
term<strong>in</strong>al ends, For over Cable jo<strong>in</strong>ts/ Cable end<br />
term<strong>in</strong>al /over lugs heat shr<strong>in</strong>k sleeve / PVC sleeve to<br />
be used. Confirm<strong>in</strong>g IS Standard only.<br />
Remarks : (A) For QC clearance Repair, refurbishment / <strong>in</strong>stallation / fitment &<br />
test<strong>in</strong>g /commission<strong>in</strong>g of Electrical DL’s on the ship /craft/boat<br />
(B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold<br />
(ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS<br />
© (i) CHP (Customer Hold po<strong>in</strong>t ) The contactor is not to proceed further till approval of QC<br />
Supervisor<br />
(ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out,<br />
Gauges & measur<strong>in</strong>g <strong>in</strong>struments to be submitted. If requirement of recalibration, To be<br />
carried from approved Govt lab.<br />
(iii) Test certificates of material / spares from OEM make / Government approved lab to<br />
be<br />
provided / submitted. New material used dur<strong>in</strong>g overhaul<strong>in</strong>g / New <strong>in</strong>stallation<br />
of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered <strong>in</strong><br />
stage wise / <strong>in</strong> process <strong>in</strong>spection that are Removal, Open<strong>in</strong>g, overhaul<strong>in</strong>g,<br />
Installation and load trials & commission<strong>in</strong>g for QC checks. If HAT & SAT trials<br />
reports and Ship issued WDC to be submitted for preparation for <strong>in</strong>spection Note.<br />
(v) Additional QC checks may be undertaken <strong>in</strong> case of repeated failure.<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE : REFIT<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 81/127