naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ANNEX 2 to Encl – III to RFP<br />
SCOPE OF WORK<br />
Reproduce the Text of SOR f<strong>in</strong>alised and accepted dur<strong>in</strong>g CNC<br />
(Will be <strong>in</strong>cluded <strong>in</strong> the document on approval of draft contract)<br />
FORMAT OF PROMULGATION CHANGE IN SCOPE OF WORK<br />
1. NAME OF WORK : ____________________<br />
2. D.L. NO : _________________ (Wherever applicable)<br />
3. Proposed by : ________________<br />
4. Reference: _________________<br />
Drg. Document _______________<br />
5. Details of additional work (if required use overleaf of the form / attach<br />
Annexures)<br />
NAME DESIGNATION SIGNATURE OF THE PROPOSER<br />
6. (a) Proposal No._______________<br />
ANNEX 3 to Encl – III to RFP<br />
(b)<br />
(c)<br />
Effect on overall Schedule<br />
Approved Cost<br />
REP OF FIRM/PROJECT MANAGER OF SHPYARD<br />
7. Approved / Not approved<br />
(Reasons if any)<br />
COA/HEAD OF PROJECT MONITORING TEAM<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 121/127