06.03.2014 Views

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEX­ 2 to Encl – III to RFP<br />

SCOPE OF WORK<br />

Reproduce the Text of SOR f<strong>in</strong>alised and accepted dur<strong>in</strong>g CNC<br />

(Will be <strong>in</strong>cluded <strong>in</strong> the document on approval of draft contract)<br />

FORMAT OF PROMULGATION CHANGE IN SCOPE OF WORK<br />

1. NAME OF WORK : ____________________<br />

2. D.L. NO : _________________ (Wherever applicable)<br />

3. Proposed by : ________________<br />

4. Reference: _________________<br />

Drg. Document _______________<br />

5. Details of additional work (if required use overleaf of the form / attach<br />

Annexures)<br />

NAME DESIGNATION SIGNATURE OF THE PROPOSER<br />

6. (a) Proposal No._______________<br />

ANNEX­ 3 to Encl – III to RFP<br />

(b)<br />

(c)<br />

Effect on overall Schedule<br />

Approved Cost<br />

REP OF FIRM/PROJECT MANAGER OF SHPYARD<br />

7. Approved / Not approved<br />

(Reasons if any)<br />

COA/HEAD OF PROJECT MONITORING TEAM<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 121/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!