naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
efurbishment, new<br />
<strong>in</strong>stallation and<br />
commission<strong>in</strong>g/Test<strong>in</strong>g<br />
of transformer /<br />
CT/PT<br />
miss<strong>in</strong>g /defects. ii) Body to be renewed / overhauled/<br />
repa<strong>in</strong>ted iii) Check for varnish of w<strong>in</strong>d<strong>in</strong>g & <strong>in</strong>sulation &<br />
ohmic value. iv) Check for fitment, tightness of<br />
connections & secure with earth<strong>in</strong>g of transformer .<br />
v) Check for operational and load performance<br />
NAVAL DOCKYARD, MUMBAI<br />
TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3<br />
DEPT. :<br />
QC(ELECTRICAL )<br />
C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 05 OF 14<br />
Sr. ACTIVITY<br />
No. DESCRIPTION<br />
REFERENCE DOCMENT & CHECK LIST INSPECTION<br />
SCOPE OF WORK P R W H<br />
06 Repair, Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
Refer to QAP : QCL074QAP059 for control panels.<br />
i) Visual checks after open<strong>in</strong>g for any defects<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g of control<br />
1 2&3 3 3<br />
commission<strong>in</strong>g/Test<strong>in</strong>g panels. iii) Check defective /miss<strong>in</strong>g competent to be<br />
renewed as per sample / OEM make/ reputed make. iv)<br />
of Control panels<br />
Check for fitment, connection, secure & tightness of<br />
control panels. New material bill to be submitted v)<br />
Overload relay to be calibrated<br />
vi) New material compartment to be offered the QC check<br />
prior to fitment. vii) Operational performance to be<br />
checked as per Tech. manual & data.<br />
07 Repair, Overhaul<strong>in</strong>g,<br />
refurbishment, new<br />
<strong>in</strong>stallation and<br />
commission<strong>in</strong>g/Test<strong>in</strong>g<br />
of Self Starter /<br />
Battery charg<strong>in</strong>g<br />
Alternator / Dynamo<br />
i) Visual checks after open<strong>in</strong>g for any defects for<br />
serviceability.<br />
ii) Check for overhaul<strong>in</strong>g, repair<strong>in</strong>g and clean<strong>in</strong>g / renewal.<br />
iii) Check defective /miss<strong>in</strong>g competent to be renewed as<br />
per sample / OEM make/ reputed make. iv) Check for<br />
fitment, connection, secure & tightness. New material bill<br />
to be submitted v) If item /equipment found beyond<br />
repair to be renewed as per sample/make/ OEM<br />
make/rat<strong>in</strong>g.<br />
vi) New material compartment to be offered the QC check<br />
prior to fitment. vii) Operational performance to be<br />
checked as per Tech. manual & data. V)Test<br />
certificated to be produced / submitted. iv) Check for full<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 71/127<br />
1 2&3 3 3