un about $225/kW. We will assume $300 to allow for<br />

buried services. Roughly, then, the total power system<br />

capacity <strong>and</strong> cost will be as given in Table 10-6. The<br />

power plant should probably be designed at the outset<br />

to h<strong>and</strong>le the ultimate needs, since on-site construction<br />

would raise the power consumption during this phase.<br />

TABLE 10.6<br />

Power, MW<br />

Number<br />

<strong>of</strong> 100-m Equivalent Cost,<br />

antennas aperture, km Peak Average $ Million<br />

100 1 4 2.2 2.4<br />

200 1.4 7 3.4 4.2<br />

500 2.2 16 7 10<br />

1000 3.16 31 12 20<br />

2000 4.4 61 25 36<br />

122