23.10.2014 Views

Advanced POWER Virtualization on IBM System p5 - Previous ...

Advanced POWER Virtualization on IBM System p5 - Previous ...

Advanced POWER Virtualization on IBM System p5 - Previous ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Functi<strong>on</strong> /<br />

capability<br />

<strong>IBM</strong> <strong>System</strong> z9<br />

virtualizati<strong>on</strong> technology<br />

<strong>IBM</strong> <strong>System</strong> <strong>p5</strong><br />

virtualizati<strong>on</strong><br />

technology<br />

Sharing<br />

memory<br />

resources<br />

LPAR memory is fixed and<br />

private; for LPARs running<br />

z/OS, the memory size<br />

can be dynamically<br />

changed with some<br />

c<strong>on</strong>siderati<strong>on</strong>s.<br />

Porti<strong>on</strong>s of VM memory can<br />

be shared read-<strong>on</strong>ly or<br />

read-write with other VMs;<br />

changing the memory size<br />

of a VM requires IPLing this<br />

VM.<br />

LPAR memory is fixed<br />

and private; memory size<br />

can be dynamically<br />

changed for LPARs<br />

running AIX 5L.<br />

Virtual<br />

interpartiti<strong>on</strong><br />

communicati<strong>on</strong><br />

TCP/IP with<br />

HiperSockets.<br />

TCP/IP with virtual<br />

HiperSockets, TCP/IP, and<br />

other protocols through<br />

virtual Ethernet with IEEE<br />

802.1Q VLAN support.<br />

TCP/IP and other<br />

protocols through virtual<br />

Ethernet with IEEE<br />

802.1Q VLAN support.<br />

Sharing<br />

c<strong>on</strong>necti<strong>on</strong>s to<br />

external<br />

networks<br />

Enhanced Multiple Image<br />

Facility (EMIF)<br />

multiplexes Open<br />

<strong>System</strong>s Adapter (OSA)<br />

to multiple LPARs.<br />

Virtual Ethernet switch<br />

bridges virtual Ethernet to<br />

an external Ethernet though<br />

an OSA,<br />

z/VM also takes advantage<br />

of multiplexed access to<br />

OSA through EMIF.<br />

Shared Ethernet Adapter<br />

(SEA), hosted by the<br />

Virtual I/O Server (VIOS),<br />

acts as layer-2-bridge<br />

between physical and<br />

virtual Ethernet adapters.<br />

Sharing I/O<br />

resources.<br />

EMIF multiplexes<br />

channels and devices to<br />

multiple LPARs.<br />

z/VM provides virtual<br />

devices, such as minidisks,<br />

which are partiti<strong>on</strong>s of<br />

physical disks, and it<br />

provides shared access to<br />

physical devices.<br />

VIOS provides virtualized<br />

disks, which can be<br />

partiti<strong>on</strong>s of physical<br />

disks and are accessed<br />

through virtual SCSI<br />

adapters.<br />

Supported OS.<br />

z/OS, Linux, z/VM, and others zSeries® operating<br />

systems.<br />

AIX 5L, Linux, and<br />

i5/OS <strong>on</strong> some models.<br />

The mechanisms for sharing of processor resources <strong>on</strong> <strong>IBM</strong> <strong>System</strong> z9 and<br />

<strong>System</strong> <strong>p5</strong> are similar. The number of virtual processors in a <strong>System</strong> <strong>p5</strong> LPAR or<br />

in a z/VM virtual machine can exceed the number of installed physical<br />

processors. There are some differences with capping that are bey<strong>on</strong>d the scope<br />

of this discussi<strong>on</strong>.<br />

On a <strong>System</strong> z9 server, integrated inter- and intra-partiti<strong>on</strong> workload<br />

management can be performed with the Intelligent Resource Director (IRD) for<br />

z/OS LPARs, while <strong>on</strong> a <strong>System</strong> <strong>p5</strong>, inter-partiti<strong>on</strong> management is d<strong>on</strong>e with the<br />

Partiti<strong>on</strong> Load Manager (PLM), and intra-partiti<strong>on</strong> management with the AIX 5L<br />

Workload Manager (WLM). Since PLM and WLM are not integrated, PLM <strong>on</strong><br />

<strong>System</strong> <strong>p5</strong>, like VMRM <strong>on</strong> <strong>System</strong> z9, m<strong>on</strong>itors WLM’s applicati<strong>on</strong> priorities and<br />

14 <str<strong>on</strong>g>Advanced</str<strong>on</strong>g> <str<strong>on</strong>g>POWER</str<strong>on</strong>g> <str<strong>on</strong>g>Virtualizati<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> <strong>IBM</strong> <strong>System</strong> <strong>p5</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!