23.10.2014 Views

Advanced POWER Virtualization on IBM System p5 - Previous ...

Advanced POWER Virtualization on IBM System p5 - Previous ...

Advanced POWER Virtualization on IBM System p5 - Previous ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Select the type of operati<strong>on</strong> you wish to perform and click OK. The Setup<br />

Scheduled Operati<strong>on</strong> window that is presented next has a similar form for all<br />

operati<strong>on</strong>s. It has two or three tabs labelled: Date and Time, Repeat, and Opti<strong>on</strong>s<br />

(there are no opti<strong>on</strong>s for Operating <strong>System</strong> Shutdown). The window for Dynamic<br />

Rec<strong>on</strong>figurati<strong>on</strong> is shown in Figure 6-26. The date and time fields are mandatory.<br />

You also specify a time window in which the operati<strong>on</strong> will start. The smallest<br />

time window is ten minutes.<br />

Figure 6-26 Setup a Scheduled Operati<strong>on</strong> Date and Time tab<br />

If you wish to periodically change the c<strong>on</strong>figurati<strong>on</strong>, click the Repeat tab, which is<br />

shown in Figure 6-27. The repetiti<strong>on</strong> frequency can be daily or weekly. In this<br />

example the c<strong>on</strong>figurati<strong>on</strong> will change every Friday for the next year.<br />

Weekly<br />

Repeat<br />

Every Friday<br />

For 52 weeks<br />

Figure 6-27 Set up a Scheduled Operati<strong>on</strong> Repeat window<br />

418 <str<strong>on</strong>g>Advanced</str<strong>on</strong>g> <str<strong>on</strong>g>POWER</str<strong>on</strong>g> <str<strong>on</strong>g>Virtualizati<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> <strong>IBM</strong> <strong>System</strong> <strong>p5</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!