03.11.2014 Views

The Matrix System at Work - Independent Evaluation Group - World ...

The Matrix System at Work - Independent Evaluation Group - World ...

The Matrix System at Work - Independent Evaluation Group - World ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX H<br />

WORKING ACROSS ORGANIZATIONAL BOUNDARIES: THE USE OF CROSS SUPPORT<br />

support, i.e. time staff spent supporting the regional VPU in which they worked in<br />

FY09.<br />

32. <strong>The</strong>re has been limited cross support across network boundaries i.e. cross<br />

support from anchor to anchor, from regional sector units to anchors of other<br />

networks, or between sector units of different networks within each Region (e.g.<br />

FY10 cross support from network anchors to other anchors accounted for only 0.2<br />

percent of anchors’ staff time).<br />

Key Definitions<br />

CROSS SUPPORT<br />

33. Cross support is defined as “staff time of an expert or specialist purchased from<br />

outside the responsible unit for a specific task.” 1 Such tasks include joint missions,<br />

analytical and advisory activities (AAA) pieces or projects, peer reviews, and multisectoral<br />

work (e.g. project-level fiduciary and safeguard services, Public Expenditure<br />

Reviews (PERs), Poverty Reduction Str<strong>at</strong>egy Paper (PRSP) process and reviews,<br />

Poverty Assessments, etc).<br />

34. Cross support is short-term by n<strong>at</strong>ure (typically a few staff weeks) and should<br />

not be confused with staff movement/rot<strong>at</strong>ion which refers to longer term<br />

arrangements and involves staff’s administr<strong>at</strong>ive transfer from one unit to another<br />

without budget transfer. Staff from one unit can also spend time working in/for<br />

another unit under a <strong>Work</strong> Program Agreement (WPA). In this case both budget and<br />

task management responsibilityare transferred to the receiving unit.<br />

Types of cross support<br />

35. <strong>The</strong>re are two broad c<strong>at</strong>egories of cross support: inter-VPU cross support and<br />

intra-VPU cross support. Inter-VPU cross support refers to cross support from one<br />

VPU to another (e.g. from one Region to a network anchor or vice versa); while<br />

intra-VPU cross support is cross support within a VPU (see examples in Table H.1).<br />

Table H.1. Selected Case Scenarios for Intra-VPU Cross Support<br />

VPU Receiving Unit/Buyer Providing Unit/Seller Examples of Tasks<br />

Region Sector Management Units Regional Core Services unit, Fiduciary and Safeguard work, multisector<br />

(SMUs)<br />

or other SMU in the same<br />

tasks, core diagnostic work<br />

Region<br />

Country Management Units<br />

(CMUs)<br />

region<br />

SMUs in the same region<br />

CMU managed work including<br />

country monitoring, and Environment<br />

and social fiduciary work<br />

1 http://intranet.worldbank.org/WBSITE/INTRANET/UNITS/SRM/0,,contentMDK:22349958~page<br />

PK:67677~piPK:64094917~theSitePK:134920,00.html<br />

186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!