03.11.2014 Views

The Matrix System at Work - Independent Evaluation Group - World ...

The Matrix System at Work - Independent Evaluation Group - World ...

The Matrix System at Work - Independent Evaluation Group - World ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX H<br />

WORKING ACROSS ORGANIZATIONAL BOUNDARIES: THE USE OF CROSS SUPPORT<br />

reached 15 percent for Africa 4 ; SDN sold 23 percent of staff time to other units of the<br />

Bank, while PREM sold 10 percent of staff time.<br />

Table H.6. Total Cross Support Sold by Regions and Network Anchors, FY10<br />

Total cross support sold (staff weeks) Total cross support sold (% of seller's<br />

total time)<br />

Inter-VPU<br />

XS<br />

Intra-VPU XS Total XS Total time Inter-VPU XS Intra-VPU XS Total XS<br />

AFR 1351 4776 6127 41758 3.2% 11.4% 14.7%<br />

EAP 803 4249 5052 25150 3.2% 16.9% 20.1%<br />

LCR 703 3934 4637 20415 3.4% 19.3% 22.7%<br />

SAR 729 3847 4576 20648 3.5% 18.6% 22.2%<br />

4 Regions 3586 16806 20392 107971 3.3% 15.6% 18.9%<br />

Total cross support sold (staff weeks) Total cross support sold (% of seller's<br />

time)<br />

Inter-VPU<br />

XS<br />

Intra-VPU XS Total XS Total time Inter-VPU XS Intra-VPU XS Total XS<br />

SDN 2663 2155 4818 21017 12.7% 10.3% 22.9%<br />

HDN 808 362 1170 5356 15.1% 6.8% 21.8%<br />

PREM 427 27 454 4476 9.5% 0.6% 10.1%<br />

FPD 686 639 1325 5958 11.5% 10.7% 22.2%<br />

Networks 4584 3183 7767 36807 12.50% 8.6% 21.1%<br />

TOTAL 4<br />

Regions + 8170 19989 28159 144778 5.6% 13.8% 19.4%<br />

Networks<br />

Source: <strong>World</strong> Bank D<strong>at</strong>abase<br />

Note: Europe and Central Asia and the Middle East and North Africa underwent unit restructuring during FY10; reliable d<strong>at</strong>a<br />

on cross support within the Middle East and North Africa and Europe and Central Asia was unavailable. In East Asia and<br />

the Pacific, because of the unique structure of SDN sector units, inter-sectoral cross support could not be entirely isol<strong>at</strong>ed<br />

from cross support across countries.<br />

INTRA-REGIONAL CROSS SUPPORT<br />

56. A closer look <strong>at</strong> the composition of intra-regional cross support only stresses<br />

cross-regional differences. Table B.7 shows the distribution of intra-regional cross<br />

support over the period FY02-10.<br />

57. Africa, East Asia and the Pacific, L<strong>at</strong>in America and the Caribbean and South<br />

Asia combined sold on average of about 17 percent intra-regional cross support over<br />

the period FY02-10: intra-regional cross support was 21.5 percent in L<strong>at</strong>in America<br />

4 <strong>The</strong> lower level of intra-VPU cross support for the Africa Region can in part be explained by the<br />

change in budget settlement rules for fiduciary and safeguard services effective FY10. <strong>The</strong>y are no<br />

longer considered cross support but are now part of the WPA. This led to a drop in cross support<br />

from regional central units to SMUs and CMUs from 7.1 percent in FY09 to1.8 in FY10.<br />

193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!