5.<br />

6.<br />

Bituminous penetration<br />

macadam/built up spray<br />

grout.<br />

Dense bituminous<br />

macadam/semi dense<br />

bituminous<br />

concrete/Bituminous<br />

concrete<br />

binder content and<br />

aggregate grading<br />

controlling of temperature of<br />

binder and aggregate for<br />

mixing and of the mix at the<br />

time of laying and rolling<br />

rate of spread of mixed<br />

material<br />

density of compacted layer<br />

Quality of binder<br />

Aggregate impact value / los<br />

angeles abrasion value<br />

Flakiness index and<br />

elongation index<br />

Striping value<br />

Water absorption of<br />

aggregates<br />

water sensitivity of mix<br />

Aggregate grading<br />

soundness (magnesium and<br />

sodium Sulphate)<br />

Percentage of fractured face<br />

Temperature of binder at<br />

application<br />

Rate of spread of binder<br />

Quality of binder<br />

Aggregate impact value/los<br />

angeles abrasion value<br />

Flakiness index and<br />

elongation index<br />

Striping value<br />

Soundness (magnesium and<br />

sodium Sulphate)<br />

Water absorption of<br />

aggregates<br />

Sand equivalent test<br />

Plasticity index<br />

Polished stone value<br />

Percentage of fractured<br />

faces<br />

Mix grading<br />

periodic subject to<br />

minimum of two tests<br />

per day per plant<br />

at regular close intervals<br />

regular control thorough<br />

checks of layers<br />

thickness<br />

one test per 250m 2 of<br />

area<br />

same as mentioned<br />

under serial no.1<br />

one test per 200 m 3 of<br />

aggregates<br />

same as mentioned<br />

under serial no.2<br />

same as serial no.2<br />

same as serial no.2<br />

one test per 100 m 2 of<br />

aggregates<br />

same as mentioned<br />

under serial no.2<br />

same as mentioned<br />

under serial no.2<br />

at regular close interval<br />

same as mentioned<br />

under serial no.2<br />

same as mentioned<br />

under serial no.2<br />

same as mentioned<br />

under serial no.2<br />

-do-<br />

-do-<br />

same as mentioned<br />

under serial no.2<br />

same as mentioned<br />

under serial no.2<br />

same as serial no.2<br />

As required<br />

As required<br />

As required for semi<br />

dense bituminous<br />

concrete/bituminous<br />

concrete<br />

same as mentioned<br />

under serial no.2<br />

one set of tests on<br />

individual constituents