c) Sequence of construction and details of temporary or enabling works like diversion,<br />

cofferdam, formwork including specialized formwork for superstructure, details of borrow<br />

areas, method of construction of embankment, sub-grade and pavement, pile concreting,<br />

proprietary processes and products and equipments to be deployed. Wherever required<br />

technical literature, design calculations and drawings shall be included in the method<br />

statement;<br />

d) Testing and acceptance procedure including documentation;<br />

e) The special part of the QA programme under sub-Section 105.3 for the particular item of<br />

work shall accompany the method statement for the concerned activity.<br />

The Engineer shall examine and approve the method statement with the required modifications. The<br />

modified method statement if required shall be submitted within 14 days of the receipt of the Engineer’s<br />

approval. The sole responsibility for adequacy and safety of the method adopted by the Contractor shall<br />

rest on the Contractor irrespective of any approval given by the Engineer.<br />

116 CRUSHED STONE AGGREGATES<br />

Where the terms crushed gravel/shingle, crushed stone, broken stone or stone aggregate appear in any<br />

part of the Tender Documents or Drawings issued for work, they refer to crushed gravel/crushed<br />

shingle/crushed stone aggregate obtained from integrated crushing plant having appropriate primary<br />

crusher, secondary cone crusher, vertical shaft impact or and vibratory screen unless specified otherwise.<br />

117 APPROVAL OF MATERIALS<br />

Approval of all sources of material for work shall be obtained in writing from the Engineer before their use<br />

on the works.<br />

118 SUPPLY OF QUARRY SAMPLES<br />

Raw and processed samples of the mineral aggregates from the approved quarry shall be submitted by the<br />

Contractor at his cost.<br />

119 USE OF SURFACES BY CONSTRUCTION TRAFFIC<br />

119.1 Ordinarily, no construction traffic shall be allowed on pavement under construction unless authorized<br />

by the Engineer. Even in that case, the load and intensity of construction traffic should be so regulated that<br />

no damage is caused to the sub-grade or pavement layers already constructed. Where necessary, service<br />

roads shall be constructed for this purpose and the same shall be considered as incidental to the work.<br />

119.2 The wheels or the tracks of plant moving over the various pavement courses shall be kept free of<br />

deleterious materials.<br />

119.3 Bituminous base course shall be kept clean and uncontaminated as long as the same remains<br />

uncovered by a wearing course or surface treatment. The only traffic permitted access to the base course<br />

shall be that engaged in laying and compacting the wearing course or that engaged on such surface<br />

treatment where the base course is to be blinded and/or surface dressed. Should the base course or tack<br />

coat on the base course become contaminated, the Contractor shall make good by clearing it to the<br />

satisfaction of the Engineer, and if this is impracticable, by removing the layer and replacing it to<br />

<strong>Specification</strong>s without any extra cost to the Employer.<br />

120 FIELD LABORATORY<br />

120.1 Scope<br />

The work covers the provision and maintenance of an adequately equipped field laboratory as required for<br />

site control on the quality of materials and the works.<br />

120.2 Description<br />

The Contractor shall arrange to provide fully furnished and adequately equipped field laboratory. The field<br />

laboratory shall preferably be located adjacent to the site office of the Engineer and provided with amenities<br />

like water supply, electric supply etc. as for the site office of the Engineer in Section 120.2.