27.01.2015 Views

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2008. TESTS AND STANDARDS OF ACCEPTANCE<br />

The materials shall be tested in accordance with these specifications and shall meet the prescribed<br />

criteria. The work shall conform to these specifications and shall meet the<br />

prescribed standards of acceptance.<br />

2009. MEASUREMENTS FOR PAYMENT<br />

Bearings shall be measured in numbers, according to their capacities and particular specifications given<br />

on the drawings. The quantity of elastomeric bearings shall be measured in cubic centimeters of<br />

finished dimensions.<br />

2010. RATE<br />

The contract unit rate of each type of bearing shall include the cost of supplying and fixing the bearings<br />

in position complete as specified on the drawings or as decided by the Engineer. The rate shall also<br />

include the cost of samples and their testing when desired by the Engineer.<br />

In case of steel bearings the rate shall include the cost of all nuts, bolts, the cost of all tests prescribed<br />

in the specifications and shown on the drawings.<br />

Where the Department supplies the bearings, the rate for fixing them shall include the cost of anchor<br />

bolts, their fixing, transport of bearings from the place of supply to the site, handling and placing them in<br />

position as per direction of the Engineer.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!